Docket No |
Docket Name |
Filed |
Final Order |
Order Date |
ADV 1674 [PDF]
|
PGE ADVICE NO. 24-35 SCHEDULE 105 MISCELLANEOUS REGULATORY ADJUSTMENTS |
11/22/2024 |
| |
ADV 1672 [PDF]
|
PGE ADVICE NO. 24-34 ENERGY PAYMENT UPDATE FOR SCHEDULE 26 |
11/19/2024 |
| |
ADV 1669 [PDF]
|
PGE ADVICE NO. 24-32 SCHEDULE 128 SHORT TERM TRANSITION ADJUSTMENT |
11/15/2024 |
| |
UM 2357 [PDF]
|
PGE 2025 ALL-SOURCE REQUEST FOR PROPOSALS |
11/15/2024 |
| |
ADV 1670 [PDF]
|
PGE ADVICE NO. 24-33 ANNUAL UPDATE TARIFF |
11/15/2024 |
| |
ADV 1666 [PDF]
|
PGE ADVICE NO. 24-31 SCHEDULE 136 OSP COST RECOVERY MECHANISM |
11/13/2024 |
| |
ADV 1664 [PDF]
|
PGE ADVICE NO. 24-29 SCHEDULE 126 ANNUAL POWER COST VARIANCE MECHANISM |
11/7/2024 |
| |
ADV 1665 [PDF]
|
PGE 24-30 SCHEDULE 150 TE COST RECOVERY MECHANISM |
11/7/2024 |
| |
ADV 1661 [PDF]
|
PGE ADVICE NO. 24-27 SCHEDULE 145 BOARDMAN DECOUPLING ADJUSTMENT |
11/1/2024 |
| |
ADV 1662 [PDF]
|
PGE ADVICE NO. 24-28 SCHEDULE 146 COLSTRIP POWER PLANT OPERATING LIFE ADJUSTMENT |
11/1/2024 |
| |
UP 431 [PDF]
|
PGE SALE OF UTILITY PROPERTY |
10/31/2024 |
| |
ADV 1657 [PDF]
|
PGE ADVICE NO . 24-25 SCHEDULE 103 MSHS BUSINESS INCOME TAX |
10/30/2024 |
| |
ADV 1658 [PDF]
|
PGE ADVICE NO. 24-26 SCHEDULE 106 MCBIT UPDATE |
10/30/2024 |
| |
ADV 1655 [PDF]
|
PGE ADVICE NO. 24-24 SCHEDULE 138 ENERGY STORAGE COST RECOVERY MECHANISM |
10/28/2024 |
| |
UM 2352 [PDF]
|
PGE OAR 860-038-0580 WAIVER |
10/24/2024 |
| |
ADV 1654 [PDF]
|
PGE ADVICE NO. 24-23 SCHEDULE 123 DECOUPLING ADJUSTMENT |
10/23/2024 |
| |
ADV 1653 [PDF]
|
PGE ADVICE NO. 24-22 SCHEDULE 102 FEDERAL COLUMBIA RIVER BENEFITS |
10/22/2024 |
| |
ADV 1650 [PDF]
|
PGE ADVICE NO. 24-21 SCHEDULE 131 OCAT |
10/21/2024 |
| |
ADV 1649 [PDF]
|
PGE ADVICE NO. 24-20 SCHEDULE 13 SMART GRID TESTBED PILOT UPDATE |
10/17/2024 |
| |
UM 2347 [PDF]
|
PGE 57 KV ASSET RECLASSIFICATION |
9/27/2024 |
| |
ADV 1645 [PDF]
|
PGE ADVICE NO. 24-19 SCHEDULE 18 INCOME QUALIFIED BILL DISCOUNT |
9/27/2024 |
| |
UM 2346 [PDF]
|
PGE APPLICATION APPROVING QUEUE REFORM PROPOSAL |
9/17/2024 |
| |
ADV 1642 [PDF]
|
PGE ADVICE NO. 24-17 SCHEDULE 151 WILDFIRE MITIGATION COST RECOVERY UPDATE |
8/26/2024 |
| |
ADV 1638 [PDF]
|
PGE ADVICE NO. 24-15 NEW SCHEDULE 343 |
8/2/2024 |
| |
ADV 1639 [PDF]
|
PGE ADVICE NO. 24-16 NEW SCHEDULE 342 |
8/2/2024 |
| |
ADV 1629 [PDF]
|
PGE ADVICE NO. 24-12 2024 MULTI-YEAR OPT-OUT WINDOW ENROLLMENT PERIOD W |
6/28/2024 |
| |
ADV 1630 [PDF]
|
PGE ADVICE NO. 24-13 SCHEDULE 300 RESIDENTIAL LINE EXTENSION ALLOWANCE |
6/28/2024 |
| |
ADV 1618 [PDF]
|
PGE ADVICE NO. 24-11 SCHEDULES 7 AND 32 |
5/29/2024 |
| |
ADV 1616 [PDF]
|
PGE ADVICE NO. 24-10 SCHEDULE 13 SMART GRID TESTBED PILOT UPDATE |
5/23/2024 |
| |
ADV 1610 [PDF]
|
PGE ADVICE NO. 24-09 NEW SCHEDULE 342 VOLUNTARY ON-BILL REPAYMENT SERVICE |
5/15/2024 |
| |
ADV 1604 [PDF]
|
PGE'S ADVICE NO. 24-08, SCHEDULE 102 TARRIFF NAME CHANGE |
4/9/2024 |
| |
PCN 6 [PDF]
|
PGE CERTIFICATION OF PUBLIC CONVENIENCE AND NECESSITY |
4/2/2024 |
| |
ADV 1601 [PDF]
|
PGE ADVICE NO. 24-07 IBEW LOCAL 125 LABOR RATE UPDATE |
3/7/2024 |
| |
UE 435 [PDF]
|
PGE REQUEST FOR A GENERAL RATE REVISION |
2/29/2024 |
| |
ADV 1595 [PDF]
|
PGE ADVICE NO. 24-05 SCHEDULE 109 EE FUNDING ADJUSTMENT |
2/22/2024 |
| |
UP 426 [PDF]
|
PGE PROPERTY SALE |
2/17/2024 |
| |
ADV 1594 [PDF]
|
PGE ADVICE NO. 24-04 SCHEDULE 128 SHORT TERM TRANSITION ADJUSTMENT UPDATE |
2/15/2024 |
| |
ADV 1590 [PDF]
|
PORTLAND GENERAL ELECTRIC COMPANY SCHEDULE 25 |
1/31/2024 |
| |
ADV 1589 [PDF]
|
PGE ADVICE NO. 24-02 SCHEDULE 7 AND 32 |
1/29/2024 |
| |
UM 2314 [PDF]
|
PGE DEFERRAL OF CRITICAL STORM RESTORATION COSTS |
1/16/2024 |
| |
UM 2313 [PDF]
|
PGE'S DEFERRAL OF SALES NORMALIZATION ADJUSTMENT REVENUES |
1/8/2024 |
| |
UE 430
|
PGE INVESTIGATION INTO NEW LOAD CONNECTION COSTS |
12/1/2023 |
| |
ADV 1577 [PDF]
|
PGE ADVICE NO. 23-39 LATE PAYMENT RATE AND INTEREST UM 779 COMPLIANCE |
11/30/2023 |
| |
ADV 1575 [PDF]
|
PGE ADVICE NO. 23-38 ENERGY PAYMENT UPDATE FOR SCHEDULE 26 |
11/28/2023 |
| |
ADV 1573 [PDF]
|
PGE ADVICE NO. 23-37 MISCELLANEOUS REGULATORY ADJUSTMENTS |
11/22/2023 |
| |
ADV 1572 [PDF]
|
PGE ADVICE NO. 23-36 SCHEDULE 137 CUSTOMER-OWNED SOLAR PAYMENT OPTION |
11/21/2023 |
| |
ADV 1568 [PDF]
|
PGE ADVICE NO. 23-35 SCHEDULE 131 OCAT |
11/17/2023 |
| |
ADV 1564 [PDF]
|
PGE ADVICE NO. 23-32 SCHEDULE 153 CBIAG |
11/16/2023 |
| |
ADV 1565 [PDF]
|
PGE ADVICE NO. 23-33 SCHEDULE 150 TE COST RECOVERY MECHANISM |
11/16/2023 |
| |
ADV 1566 [PDF]
|
PGE ADVICE NO. 23-34 SCHEDULE 136 CSP COST RECOVERY MECHANISM |
11/16/2023 |
| |
ADV 1560 [PDF]
|
PGE ADVICE NO. 23-30 SCHEDULE 135 DEMAND RESPONSE RECOVERY MECHANISM |
11/15/2023 |
| |
ADV 1561 [PDF]
|
PGE ADVICE NO. 23-21 SCHEDULE 128 SHORT TERM TRANSITION ADJUSTMENT |
11/15/2023 |
| |
ADV 1559 [PDF]
|
PGE ADVICE NO. 23-29 SCHEDULE 152 MAJOR EVENT COST RECOVERY |
11/14/2023 |
| |
ADV 1557 [PDF]
|
PGE ADVICE NO. 23-27 SCHEDULE 102 REGIONAL POWER ACT EXCHANGE CREDIT |
11/6/2023 |
| |
ADV 1556 [PDF]
|
PGE SCHEDULE 145 REFUNDS RELATED TO BOARDMAN DECOMMISSIONING ADJUSTMENT |
11/3/2023 |
| |
ADV 1552 [PDF]
|
PGE ADVICE NO. 23-23 SCHEDULE 115 LOW-INCOME ASSISTANCE |
11/2/2023 |
| |
ADV 1553 [PDF]
|
PGE ADVICE NO. 23-24 SCHEDULE 103 MSHS |
11/2/2023 |
| |
ADV 1554 [PDF]
|
PGE ADVICE NO. 23-25 SCHEDULE 106 MCBIT UPDATE |
11/2/2023 |
| |
ADV 1549 [PDF]
|
PGE ADVICE NO. 23-21 SCHEDULE 138 ENERGY STORAGE COST RECOVERY MECHANISM UPDATE |
10/31/2023 |
| |
UM 2306 [PDF]
|
PGE DEFERRAL OF CLEARWATER WIND PROJECT COSTS |
10/31/2023 |
| |
ADV 1550 [PDF]
|
PGE ADVICE NO. 23-22 SCHEDULE 146 COLSTRIP POWER PLANT OPERATING LIFE ADJUSTMENT |
10/31/2023 |
| |
UE 427 [PDF]
|
PGE RENEWABLE RESOURCE AUTOMATIC ADJUSTMENT CLAUSE (SCHEDULE 122) (CLEARWATER) |
10/30/2023 |
| |
UF 4346 [PDF]
|
PGE FINANCE APPLICATION |
10/27/2023 |
| |
ADV 1548 [PDF]
|
PGE ADVICE NO. 23-19 RULE E |
10/26/2023 |
| |
ADV 1546 [PDF]
|
PGE ADVICE NO. 23-18 SCHEDULE 123 DECOUPLING ADJUSTMENT |
10/25/2023 |
| |
ADV 1542 [PDF]
|
PGE ADVICE NO. 23-17 SCHEDULE 13 SMART GRID TESTBED PILOT UPDATE |
10/12/2023 |
| |
ADV 1536 [PDF]
|
PGE ADVICE NO. 23-14 SCHEDULE 8, 52 AND 56 EV TE PLAN |
8/25/2023 |
| |
ADV 1533 [PDF]
|
PGE ADVICE NO. 23-13 SCHEDULES 52 AND 56 NONRESIDENTIAL EV TARIFF UPDATES |
8/9/2023 |
| |
RE 198 [PDF]
|
PORTLAND GENERAL ELECTRIC COMPANY |
8/3/2023 |
| |
ADV 1528 [PDF]
|
PGE ADVICE NO. 23-12 MULTI YEAR OPT-OUT WINDOW ENROLLMENT PERIOD V |
6/28/2023 |
| |
ADV 1523 [PDF]
|
PGE ADVICE NO. 23-11 SCHEDULE 4 MULTIFAMILY RESIDENTIAL WATER HEATER PILOT |
6/16/2023 |
| |
UM 2286 [PDF]
|
PGE 2022 RENEWABLE PORTFOLIO STANDARD COMPLIANCE REPORT |
6/1/2023 |
| |
ADV 1513 [PDF]
|
PGE ADVICE NO. 23-09 SCHEDULE 143 SPENT FUEL ADJUSTMENT |
5/25/2023 |
| |
ADV 1500 [PDF]
|
PGE ADVICE NO. 23-07 SCHEDULE 146 COLSTRIP POWER PLANT OPERATING LIFE ADJUSTMENT |
5/2/2023 |
| |
UM 2281 [PDF]
|
PGE DEFERRAL OF IE AND THIRD-PARTY CONSULTANT EXPENSES |
4/21/2023 |
| |
ADV 1494 [PDF]
|
PGE ADVICE NO. 23-06 HOUSEKEEPING TABLE OF CONTENTS SCHEDULE 152 |
4/7/2023 |
| |
LC 80 [PDF]
|
PGE 2023 INTEGRATED RESOURCE PLAN (IRP) AND CLEAN ENERGY PLAN (CEP) |
3/31/2023 |
| |
ADV 1492 [PDF]
|
PGE ADVICE NO. 23-05 SCHEDULES 7 AND 32 GREEN FUTURE RENEWABLE PORTFOLIO OPTIONS |
3/9/2023 |
| |
ADV 1491 [PDF]
|
PGE ADVICE 23-04 IBEW LOCAL 125 LABOR RATE UPDATE |
3/2/2023 |
| |
ADV 1489 [PDF]
|
PGE ADVICE NO. 23-02 SCHEDULE 128 SHORT TERM TRANSITION ADJUSTMENT UPDATE |
2/15/2023 |
| |
UM 2274 [PDF]
|
PGE REQUEST FOR WAIVER OF 2023 RFP PROCESS |
1/31/2023 |
| |
ADV 1481 [PDF]
|
PGE 23-01 SCHEDULE 320 METER INFORMATION SERVICES UPDATE |
1/13/2023 |
| |
ADV 1474 [PDF]
|
PGE ADVICE NO. 22-45 SCHEDULE 152 MAJOR EVENT COST RECOVERY |
12/16/2022 |
| |
ADV 1471 [PDF]
|
PGE ADVICE NO. 22-44 SCHEDULE 112 CUSTOMER ENGAGEMENT TRANSFORMATION |
12/13/2022 |
| |
ADV 1470 [PDF]
|
PGE ADVICE NO. 22-43 SCHEDULE 14 AND SCHEDULE 7 TARIFF UPDATES |
12/12/2022 |
| |
ADV 1469 [PDF]
|
PGE ADVICE NO. 22-42 NEW SCHEDULE 152 MAJOR EVENT COST RECOVERY |
12/2/2022 |
| |
ADV 1466 [PDF]
|
PGE ADVICE NO. 22-41 UM 779 COMPLIANCE FILING |
11/29/2022 |
| |
ADV 1462 [PDF]
|
PGE ADVICE NO. 22-40 MISCELLANEOUS REGULATORY ADJUSTMENTS |
11/21/2022 |
| |
ADV 1459 [PDF]
|
PGE ADVICE NO. 22-38 SCHEDULE 150 TE COST RECOVERY MECHANISM |
11/18/2022 |
| |
ADV 1460 [PDF]
|
PGE ADVICE NO. 22-39 SCHEDULE 135 DEMAND RESPONSE COST RECOVERY MECHANISM |
11/18/2022 |
| |
ADV 1454 [PDF]
|
PGE ADVICE NO. 22-37 SCHEDULE 136 OREGON CSP COST RECOVERY MECHANISM |
11/16/2022 |
| |
ADV 1449 [PDF]
|
PGE ADVICE NON. 22-34 SCHEDULE 128 SHORT TERM TRANSITION ADJUSTMENT |
11/15/2022 |
| |
ADV 1451 [PDF]
|
PGE ADVICE NO. 22-35 SCHEDULES 26 AND 125 NVPC |
11/15/2022 |
| |
ADV 1453 [PDF]
|
PGE ADVICE NO. 22-36 NEW SCHEDULE 153 COMMUNITY BENEFITS/IMPACT ADVISORY GROUP |
11/15/2022 |
| |
ADV 1447 [PDF]
|
PGE ADVICE NO. 22-32 SCHEDULE 118 INCOME-QUALIFIED BILL DISCOUNT |
11/14/2022 |
| |
ADV 1448 [PDF]
|
PGE ADVICE NO. 22-33 SCHEDULE 110 EE CUSTOMER SERVICE |
11/14/2022 |
| |
ADV 1444 [PDF]
|
PGE ADVICE NO. 22-30 SCHEDULE 106 MCBIT |
11/7/2022 |
| |
ADV 1442 [PDF]
|
PGE ADVICE NO. 22-29 METRO SUPPORTIVE HOUSING SERVICES BUSINESS INCOME TAX |
11/4/2022 |
| |
ADV 1440 [PDF]
|
PGE ADVICE NO. 22-27 COLSTRIP POWER PLANT OPERATING LIFE ADJUSTMENT |
10/31/2022 |
| |
ADV 1441 [PDF]
|
PGE ADVICE NO. 22-28 SCHEDULE 138 ENERGY STORAGE COST RECOVERY MECHANISM UPDATE |
10/31/2022 |
| |
ADV 1439 [PDF]
|
PGE ADVICE NO. 22-26 SCHEDULE 123 DECOUPLING ADJUSTMENT |
10/27/2022 |
| |
ADV 1438 [PDF]
|
PGE ADVICE NO. 22-25 SCHEDULE 134 GRESHAM RETROACTIVE PRIVILEGE TAX |
10/26/2022 |
| |
ADV 1437 [PDF]
|
PGE ADVICE NO. 22-24 SCHEDULE 13 SMART GRID TESTBED PILOT UPDATE |
10/18/2022 |
| |
ADV 1435 [PDF]
|
PGE ADVICE NO. 22-23 REINSTATING ON-BILL TARIFFS |
10/7/2022 |
| |
ADV 1432 [PDF]
|
PGE ADVICE NO. 22-21 COMPLIANCE WITH CHANGES TO DIVISION 21 |
10/3/2022 |
| |
ADV 1433 [PDF]
|
PGE ADVICE NO. 22-22 SCHEDULES 8 AND 52 RESIDENTIAL AND NONRESIDENTIAL EV |
10/3/2022 |
| |
ADV 1429 [PDF]
|
PGE ADVICE NO. 22-20 IBEW LOCAL 125 LABOR RATE UPDATE |
9/20/2022 |
| |
ADV 1415 [PDF]
|
PGE ADVICE NO. 22-13, 2022 MULTI-YEAR OPT-OUT WINDOW ENROLLMENT PERIOD |
8/31/2022 |
| |
RE 195 [PDF]
|
PGE SCHEDULE 18 INCOME QUALIFIED BILL DISCOUNT REPORTING |
8/19/2022 |
| |
ADV 1422 [PDF]
|
PGE ADVICE NO. 22-17 SCHEDULE 50 RETAIL EV CHARGING UPDATE |
7/29/2022 |
| |
UP 420 [PDF]
|
PGE/PACIFICORP JOINT APPLICATION FOR SALE & PURCHASE OF KNOTT-ST. JOHNS LINE |
7/28/2022 |
| |
ADV 1421 [PDF]
|
PORTLAND GENERAL ELECTRIC'S ADVICE NO. 22-16, SCHEDULE 7 AND 32 RENEWABLE OPTION |
7/18/2022 |
| |
ADV 1417 [PDF]
|
PGE ADVICE NO. 22-15 HOUSEKEEPING CHANGES CORRECTING REFERENCES |
7/14/2022 |
| |
UM 2249 [PDF]
|
PGE DEFERRAL OF ORS 469A.425 COSTS AND REVENUES |
7/7/2022 |
| |
ADV 1416 [PDF]
|
PGE ADVICE NO. 22-14 SCHEDULE 54 LARGE NONRESIDENTIAL REC RIDER UPDATE |
7/1/2022 |
| |
UP 419 [PDF]
|
PGE/IDAHO POWER SALE AND PURCHASE OF BOARDMAN PROJECT PROPERTY IN MORROW COUNTY |
6/30/2022 |
| |
ADV 1395 [PDF]
|
PORTLAND GENERAL ELECTRIC'S ADVICE NO. 22-10, SCHEDULE 53 HEAVY DUTY ELECTRIC |
6/15/2022 |
| |
UM 2241 [PDF]
|
PGE 2021 RENEWABLE PORTFOLIO STANDARD COMPLIANCE REPORT |
6/1/2022 |
| |
ADV 1397 [PDF]
|
PGE ADVICE NO. 22-11 RESIDENTIAL TESTBED PILOT UPDATE |
5/16/2022 |
| |
ADV 1393 [PDF]
|
PGE ADVICE NO. 22-09 SCHEDULE 8 RESIDENTIAL ELECTRIC VEHICLE CHARGING PILOT |
5/3/2022 |
| |
ADV 1389 [PDF]
|
PORTLAND GENERAL ELECTRIC'S ADVICE NO. 22-07 NONRESIDENTIAL DIRECT LOAD PILOT |
4/15/2022 |
| |
ADV 1385 [PDF]
|
PGE ADVICE NO. 22-05 SCHEDULE 200 DISPATCHABLE STANDBY GENERATION UPDATE |
4/7/2022 |
| |
ADV 1386 [PDF]
|
PGE ADVICE NO. 22-06 REVISE SCHEDULE 26 ENERGY PARTNER TO ACCOMODATE RESOURCES |
4/7/2022 |
| |
ADV 1384 [PDF]
|
PGE'S ADVICE NO. 22-04, REMOVE DIRECT INSTALLATION CHANNEL |
3/30/2022 |
| |
ADV 1379 [PDF]
|
PORTLAND GENERAL ELECTRIC ADVICE NO. 22-03, UPDATED RENEWABLE PORTFOLIO OPTION, |
3/2/2022 |
| |
ADV 1371 [PDF]
|
PGE ADVICE NO. 22-02, 9 MONTH BALANCE OF YEAR TRANSITION ADJUSTMENT RATES |
2/15/2022 |
| |
ADV 1365 [PDF]
|
PGE ADVICE NO. 22-01 INCOME QUALIFIED BILL DISCOUNT |
1/13/2022 |
| |
UM 2218 [PDF]
|
PGE DEFERRAL OF TE CHARGE COSTS AND REVENUES |
12/30/2021 |
| |
UM 2217 [PDF]
|
PGE DEFERRAL OF REVENUES ASSOCIATED WITH FERC OATT |
12/27/2021 |
| |
ADV 1352 [PDF]
|
PGE ADVICE NO. 21-44 MISCELLANEOUS REGULATORY ADJUSTMENTS |
11/18/2021 |
| |
ADV 1351 [PDF]
|
PGE ADVICE NO. 21-43 NEW SCHEDULE 328 CLEAN FUELS MONETIZATION CREDIT |
11/17/2021 |
| |
ADV 1349 [PDF]
|
PGE ADVICE NO. 21-42 SCHEDULE 131 OCAT RECOVERY |
11/16/2021 |
| |
ADV 1345 [PDF]
|
PGE ADVICE NO. 21-40 SCHEDULE 128 SHORT TERM TRANSITION ADJUSTMENT |
11/15/2021 |
| |
ADV 1348 [PDF]
|
PGE ADVICE NO. 21-41 ANNUAL UPDATE TARIFF |
11/15/2021 |
| |
ADV 1341 [PDF]
|
PGE ADVICE NO. 21-37 SCHEDULE 135 DEMAND RESPONSE COST RECOVERY MECHANISM |
11/12/2021 |
| |
ADV 1342 [PDF]
|
PGE ADVICE NO. 21-38 SCHEDULE 136 OREGON CSP COST RECOVERY MECHANISM |
11/12/2021 |
| |
ADV 1343 [PDF]
|
PGE ADVICE NO. 21-39 SCHEDULE 137 CUSTOMER-OWNED SPO COST RECOVERY MECHANISM |
11/12/2021 |
| |
ADV 1339 [PDF]
|
PGE ADVICE NO. 21-36 SCHEDULE 139 NEW LOAD TRANSITION COST ADJUSTMENT |
11/10/2021 |
| |
ADV 1335 [PDF]
|
PGE ADVICE NO. 21-33 SCHEDULE 103 MSHS BUSINESS INCOME TAX |
11/9/2021 |
| |
ADV 1336 [PDF]
|
PGE ADVICE NO. 21-34 SCHEDULE 115 LOW INCOME ASSISTANCE |
11/9/2021 |
| |
ADV 1337 [PDF]
|
PGE ADVICE NO. 21-35 SCHEDULE 108 PPC AND 109 EE FUNDING ADJUSTMENT |
11/9/2021 |
| |
ADV 1333 [PDF]
|
PGE ADVICE NO. 21-32 SCHEDULE 102 REGIONAL POWER ACT EXCHANGE CREDIT |
11/8/2021 |
| |
ADV 1330 [PDF]
|
PGE ADVICE NO. 21-30 SCHEDULE 122 RENEWABLE RESOURCE AUTOMATIC ADJUSTMENT CLAUSE |
11/5/2021 |
| |
ADV 1331 [PDF]
|
PGE ADVICE NO. 21-31 SCHEDULE 106 MCBIT TAX UPDATE |
11/5/2021 |
| |
ADV 1329 [PDF]
|
PGE ADVICE NO. 21-29 SCHEDULE 108 PUBLIC PURPOSE CHARGE |
11/3/2021 |
| |
ADV 1327 [PDF]
|
PGE ADVICE NO. 21-27 SCHEDULE 123 DECOUPLING ADJUSTMENT |
10/26/2021 |
| |
ADV 1328 [PDF]
|
PGE ADVICE NO. 21-28 SCHEDULE 145 BOARDMAN DECOMMISSIONING ADJUSTMENT |
10/26/2021 |
| |
ADV 1325 [PDF]
|
PGE ADVICE NO. 21-26 SCHEDULE 150 TE COST RECOVERY MECHANISM |
10/21/2021 |
| |
UM 2197 [PDF]
|
PGE DISTRIBUTION SYSTEM PLANNING REPORT |
10/15/2021 |
| |
ADV 1322 [PDF]
|
PGE ADVICE NO. 21-25 SCHEDULE 54 NONRESIDENTIAL REC RIDER UPDATES |
10/15/2021 |
| |
ADV 1321 [PDF]
|
PGE ADVICE NO. 21-24 SCHEDULE 55 LARGE NONRESIDENTIAL GEAR |
10/14/2021 |
| |
ADV 1311 [PDF]
|
PGE ADVICE NO. 21-23 SCHEDULE 5 RESIDENTIAL DIRECT LOAD CONTROL PILOT UPDATE |
9/1/2021 |
| |
ADV 1303 [PDF]
|
PGE ADVICE NO. 21-21, SCHEDULE 54 TEMPORARY SUSPENSION OF RECS |
8/12/2021 |
| |
ADV 1299 [PDF]
|
PGE ADVICE NO. 21-19 SCHEDULE 7 RESIDENTIAL RENEWABLE PORTFOLIO |
8/6/2021 |
| |
ADV 1301 [PDF]
|
PGE'S ADVICE NO. 21-20 SCHEDULE 307 RESIDENTIAL BILL ASSISTANCE PROGRAM |
8/6/2021 |
| |
ADV 1287 [PDF]
|
PGE ADVICE NOS. 21-17 & 21-22 MULTI YEAR OPT-OUT WINDOW ENROLLMENT PERIOD T |
6/30/2021 |
| |
ADV 1287 [PDF]
|
PGE ADVICE NOS. 21-17 & 21-22 MULTI YEAR OPT-OUT WINDOW ENROLLMENT PERIOD T |
6/30/2021 |
| |
ADV 1278 [PDF]
|
PGE ADVICE NO. 21-16 SCHEDULE 5 RESIDENTIAL DIRECT LOAD CONTROL PILOT UPDATE |
6/14/2021 |
| |
ADV 1273 [PDF]
|
PGE ADVICE NO. 21-15 SCHEDULE 52 NONRESIDENTIAL EV CHARGING REBATE PILOT |
5/27/2021 |
| |
ADV 1271 [PDF]
|
PGE ADVICE NO. 21-14 SCHEDULE 38 LARGE NONRESIDENTIAL STANDARD SERVICE |
5/24/2021 |
| |
RE 193 [PDF]
|
PORTLAND GENERAL ELECTRIC COMPANY ARREARAGE MANAGEMENT PROGRAM STATUS REPORT |
5/20/2021 |
| |
ADV 1265 [PDF]
|
PGE ADVICE NO. 21-13 SCHEDULE 54 |
5/4/2021 |
| |
ADV 1264 [PDF]
|
PGE ADVICE NO. 21-11 SCHEDULE 55 LARGE NONRESIDENTIAL GREEN ENERGY AFFINITY RIDE |
4/29/2021 |
| |
ADV 1262 [PDF]
|
PGE ADVICE NO. 21-10 SCHEDULE 14 RESIDENTIAL BATTERY ENERGY STORAGE PILOT REBATE |
4/22/2021 |
| |
ADV 1261 [PDF]
|
PGE ADVICE NO. 21-09 NEW SCHEDULE 56 |
4/20/2021 |
| |
ADV 1256 [PDF]
|
PGE ADVICE NO. 21-08 IBEW LOCAL 125 LABOR RATE UPDATE |
4/8/2021 |
| |
ADV 1255 [PDF]
|
PGE'S ADVICE NO. 21-07 SCHEDULE 109 ENERGY EFFICIENCY FUNDING ADJUSTMENT |
3/31/2021 |
| |
ADV 1252 [PDF]
|
PGE UPDATES SCHEDULE 50 RETAIL ELECTRIC VEHICLE CHARGING |
3/23/2021 |
| |
UE 389
|
PGE ADVICE NO. 21-03 SCHEDULE 53 |
3/10/2021 |
| |
ADV 1250 [PDF]
|
PGE ADVICE NO. 21-05 SCHEDULE 103 MSHS |
3/2/2021 |
| |
ADV 1242 [PDF]
|
PGE SCHEDULE 128 SHORT TERM TRANSITION ADJUSTMENT UPDATE APRIL 2021 |
2/16/2021 |
| |
ADV 1239 [PDF]
|
PGE ADVICE NO. 21-03 SCHEDULE 53 |
2/10/2021 |
| |
ADV 1233 [PDF]
|
PGE ADVICE NO. 21-01 NEW SCHEDULE 307 RESIDENTIAL BILL ASSISTANCE PROGRAM |
1/22/2021 |
| |
ADV 1221 [PDF]
|
PGE ADVICE NO. 20-48, SCHEDULE 103, MSHS BUSINESS INCOME TAX |
12/29/2020 |
| |
UM 2141 [PDF]
|
PGE FLEXIBLE LOAD PLAN |
12/23/2020 |
| |
ADV 1219 [PDF]
|
PGE ADVICE NO. 20-47, SCHEDULE 800, SERVICE MAPS |
12/21/2020 |
| |
ADV 1097 [PDF]
|
PGE MULTIFAMILY WATER HEATER PILOT EXTENSION (SCHED 4) TO 9/30/2020 |
12/15/2020 |
| |
ADV 1097 [PDF]
|
PGE MULTIFAMILY WATER HEATER PILOT EXTENSION (SCHED 4) TO 9/30/2020 |
12/15/2020 |
| |
ADV 1097 [PDF]
|
PGE MULTIFAMILY WATER HEATER PILOT EXTENSION (SCHED 4) TO 9/30/2020 |
12/15/2020 |
| |
ADV 1216 [PDF]
|
PGE ADVICE NO. 20-45, SCHEDULE 25 |
12/7/2020 |
| |
ADV 1213 [PDF]
|
PGE UPDATES RULE E - ESTABLISHING CREDIT/DEPOSITS PER ORDER NO. 20-401 |
12/3/2020 |
| |
ADV 1211 [PDF]
|
PGE ADVICE NO. 20-43 SCHEDULE 135 DEMAND RESPONSE COST RECOVERY MECHANISM |
11/30/2020 |
| |
ADV 1210 [PDF]
|
PGE SCHEDULE 300 AND SCHEDULE 600 CHANGES LATE PAYMENT CHARGE |
11/25/2020 |
| |
ADV 1206 [PDF]
|
PGE MISCELLANEOUS REGULATORY ADJUSTMENTS |
11/23/2020 |
| |
RE 188 [PDF]
|
PORTLAND GENERAL ELECTRIC COMPANY (PGE) COVID-19 MONTHLY REPORT. |
11/20/2020 |
| |
ADV 1201 [PDF]
|
PGE ADVICE NO. 20-39 SCHEDULE 122 RENEWABLE RESOURCE AUTOMATIC ADJUSTMENT CLAUSE |
11/19/2020 |
| |
ADV 1202 [PDF]
|
PGE ADVICE NO. 20-40 SCHEDULE 139 NEW LARGE LOAD TRANSITION COST ADJUSTMENT |
11/19/2020 |
| |
ADV 1197 [PDF]
|
PGE ADVICE NO. 20-37 SCHEDULE 128 SHORT TERM TRANSITION ADJUSTMENT |
11/16/2020 |
| |
ADV 1198 [PDF]
|
PGE ADVICE NO. 20-38 ANNUAL UPDATE TARIFF |
11/16/2020 |
| |
ADV 1196 [PDF]
|
PGE UPDATES SCHEDULE 106 MULTNOMAH COUNTY BUSINESS INCOME TAX (MCBIT) |
11/13/2020 |
| |
ADV 1195 [PDF]
|
PGE EXTENDS DIRECT LOAD CONTROL (DLC) PILOT SCHEDULE 25, ADV. NO. 20-35 |
11/12/2020 |
| |
ADV 1194 [PDF]
|
PGE UPDATES SCHEDULE 7 TIME OF USE DESIGN |
11/9/2020 |
| |
ADV 1192 [PDF]
|
PGE SCHEDULE 132 FEDERAL TAX REFORM CREDIT SETS PRICES TO 0 (ADV NO. 20-33) |
11/4/2020 |
| |
ADV 1081 [PDF]
|
PGE ELECTRIC VEHICLE POLE CHARGING DEMONSTRATION PROJECT, ADV. NO. 20-1 SCHED 16 |
11/3/2020 |
| |
ADV 1081 [PDF]
|
PGE ELECTRIC VEHICLE POLE CHARGING DEMONSTRATION PROJECT, ADV. NO. 20-1 SCHED 16 |
11/3/2020 |
| |
ADV 1081 [PDF]
|
PGE ELECTRIC VEHICLE POLE CHARGING DEMONSTRATION PROJECT, ADV. NO. 20-1 SCHED 16 |
11/3/2020 |
| |
RE 186 [PDF]
|
PGE COVID-19 DEFERRED ACCOUNTING QUARTERLY REPORT |
11/2/2020 |
| |
ADV 1190 [PDF]
|
PGE UPDATES SCHEDULE 145 BOARDMAN POWER PLANT DECOMMISSIONING ADV NO. 20-30 |
10/30/2020 |
| |
ADV 1191 [PDF]
|
PGE ADV NO 20-31 SCHEDULE 123 ADJUSTMENTS FOR SNA AND LRRA |
10/30/2020 |
| |
UM 2119 [PDF]
|
AWEC AND CUB APPLICATION TO REQUIRE PGE TO DEFER BOARDMAN EXPENSES AND COSTS |
10/8/2020 |
| |
ADV 1188 [PDF]
|
PGE ADVICE NO. 20-29 NVPC WEST HYDRO FACILITIES MAINTENANCE OUTAGE UPDATES |
9/28/2020 |
| |
ADV 1182 [PDF]
|
PGE UPDATES SCHEDULE 5 RESIDENTIAL DIRECT LOAD CONTROL PILOT |
9/8/2020 |
| |
UM 2113 [PDF]
|
PGE DEFERRAL OF BEAVERTON PUBLIC SAFETY ENERGY STORAGE MICROGRID PILOT COSTS |
9/1/2020 |
| |
ADV 1181 [PDF]
|
PGE SCHEDULE 25, NONRESIDENTIAL DIRECT LOAD CONTROL PILOT |
8/31/2020 |
| |
ADV 1180 [PDF]
|
PGE SCHEDULE 26 NONRESIDENTIAL DEMAND RESPONSE PILOT ADV. NO. 20-26 |
8/28/2020 |
| |
ADV 1178 [PDF]
|
PGE RESIDENTIAL TESTBED PILOT SCHEDULE 13 (DIRECT LOAD CONTROL ACTIVITIES) |
8/25/2020 |
| |
ADV 1170 [PDF]
|
PGE SCHEDULE 136 COMMUNITY SOLAR -COST RECOVERY MECHANISM - BILL CREDITS |
8/7/2020 |
| |
ADV 1164 [PDF]
|
PGE NEW LOAD DIRECT ACCESS PROGRAM QUEUE MANAGEMENT PLAN |
7/31/2020 |
| |
ADV 1156 [PDF]
|
PGE SCHEDULE 300 ADVICE NO. 20-20 PULSE OUTPUT METERING REINSTATED |
7/22/2020 |
| |
ADV 1155 [PDF]
|
PGE SCHEDULE 52 NONRESIDENTIAL ELECTRIC VEHICLE CHARGING REBATE PILOT |
7/17/2020 |
| |
ADV 1151 [PDF]
|
PGE SCHEDULE 8, ADV. NO. 20-18, RESIDENTIAL ELECTRIC VEHICLE CHARGING PILOT |
7/15/2020 |
| |
ADV 1149 [PDF]
|
PGE ADVICE NO 20-17, SCHEDULE 300 TRANSPORTATION ELECTRIFICATION LINE EXTENSION |
7/14/2020 |
| |
ADV 1145 [PDF]
|
PORTLAND GENERAL ELECTRIC COMMUNITY SOLAR -OPTIONAL SCHEDULE 17 |
7/2/2020 |
| |
ADV 1143 [PDF]
|
PGE 2020 OPT OUT WINDOW ENROLLMENT PERIOD S, SCHEDULE 129, ADV NO. 20-15 |
6/30/2020 |
| |
ADV 1130 [PDF]
|
PGE ADVICE NO. 20-14, SCHEDULE 300 LINE EXTENSION ALLOWANCE |
6/8/2020 |
| |
ADV 1128 [PDF]
|
PGE SCHEDULE 13 RESIDENTIAL TESTBED PILOT REVISIONS |
5/29/2020 |
| |
UM 2082 [PDF]
|
SANDY RIVER SOLAR LLC VS PORTLAND GENERAL ELECTRIC |
5/7/2020 |
| |
ADV 1114 [PDF]
|
PGE SCHEDULE 7 ADV NO 20-10 UPDATES PEAK TIME REBATE EVENT |
4/27/2020 |
| |
ADV 1115 [PDF]
|
PGE SCHEDULE 689 NEW LOAD DIRECT ACCESS HOUSEKEEPING ADV NO. 20-11 |
4/27/2020 |
| |
ADV 1112 [PDF]
|
PGE SCHEDULE 136, ADV NO 20-09 COMMUNITY SOLAR COST RECOVERY MECHANISM UPDATE |
4/23/2020 |
| |
ADV 1111 [PDF]
|
PGE RESIDENTIAL BATTERY ENERGY STORAGE PILOT SCHEDULE 14 |
4/21/2020 |
| |
ADV 1106 [PDF]
|
PGE UPDATES IBEW LABOR RATE |
3/25/2020 |
| |
ADV 1105 [PDF]
|
PGE EMERGENCY CURTAILMENT RULE C & SHORT-TERM PLAN |
3/20/2020 |
| |
ADV 1092 [PDF]
|
PGE SCHED.182, ADV. NO. 20-03 QTLRY ELECTION WINDOW SHORT TERM ADJ UPDATE |
2/18/2020 |
| |
ADV 1095 [PDF]
|
PGE ADVICE NO. 20-04 COMMUNITY SOLAR PROGRAM SCHEDULE 204 |
2/18/2020 |
| |
UM 2039 [PDF]
|
PGE REAUTHORIZATION TO DEFER EE CUSTOMER SERVICE AND BALANCING ACCOUNT |
12/10/2019 |
| |
ADV 1073 [PDF]
|
PGE, ADV. NO. 19-35 OR LATE PAYMENT & CUSTOMER DEPOSIT RATES |
12/5/2019 |
| |
ADV 1067 [PDF]
|
PGE ADV. NO. 19-33, SCHEDULE 4 MULTIFAMILY WATER HEATER PILOT EXTENSION |
11/25/2019 |
| |
ADV 1064 [PDF]
|
PGE ADVICE NO. 19-31 SCHEDULE 132, FEDERAL TAX REFORM CREDIT |
11/22/2019 |
| |
ADV 1065 [PDF]
|
PGE ADVICE NO. 19-32, SCHEDULE 105 MISCELLANEOUS REGULATORY ADJUSTMENTS |
11/22/2019 |
| |
ADV 1057 [PDF]
|
PGE ADVICE NO. 19-30 UPDATES SCHEDULE 135 PRICES - DEMAND RESPONSE |
11/20/2019 |
| |
ADV 1048 [PDF]
|
PGE ADVICE NO. 19-29, SCHEDULE 128 SHORT TERM TRANSITION ADJUSTMENT |
11/15/2019 |
| |
ADV 1051 [PDF]
|
PGE ANNUAL UPDATE TARIFF, ADVICE NO. 19-28, UE 359 COMPLIANCE |
11/15/2019 |
| |
ADV 1046 [PDF]
|
PGE ADVICE NO. 19-27 SCHEDULE 143 SPENT FUEL ADJUSTMENT PRICES |
11/14/2019 |
| |
ADV 1044 [PDF]
|
PGE ADVICE NO. 19-26 SCHEDULE 100 ENERGY EFFICIENCY CUSTOMER SERVICE |
11/13/2019 |
| |
ADV 1040 [PDF]
|
PGE SCHEDULE 109 ENERGY EFFICIENCY FUNDING ADJUSTMENT ADVICE NO. 19-22 |
11/12/2019 |
| |
ADV 1041 [PDF]
|
PGE ADVICE NO. 19-23 SCHEDULE 102 REGIONAL POWER ACT EXCHANGE CREDIT (BPA) |
11/12/2019 |
| |
ADV 1042 [PDF]
|
PGE ADVICE NO. 19-24, SCHEDULE 106, MCBIT TAX ADJUSTMENT |
11/12/2019 |
| |
ADV 1035 [PDF]
|
PORTLAND GENERAL ELECTRIC (PGE) ADV. NO. 19-21 SCHEDULE 145 BOARDMAN ADJUSTMENTS |
11/1/2019 |
| |
ADV 1034 [PDF]
|
PGE ADVICE NO. 19-20, SCHEDULE 123 DECOUPLING ADJUSTMENT |
10/31/2019 |
| |
ADV 1029 [PDF]
|
PORTLAND GENERAL ELECTRIC COMPANY ADVICE NO. 19-19 HOUSEKEEPING |
10/29/2019 |
| |
RE 182 [PDF]
|
PORTLAND GENERAL ELECTRIC ENERGY EFFICIENCY AVOIDED COST REPORT |
10/15/2019 |
| |
UM 2033 [PDF]
|
PGE TRANSPORTATION ELECTRIFICATION PLAN |
9/30/2019 |
| |
ADV 1021 [PDF]
|
PGE's Advice No. 19-18 Energy Payment Update for Schedule 26 |
9/26/2019 |
| |
ADV 1003 [PDF]
|
PGE ADVICE NO. 19-16, Residential Demand Response Water Heater Pilot
|
8/26/2019 |
| |
ADV 988 [PDF]
|
PGE ADVICE NO. 19-14, SCHED 129. MULT YEAR OPT-OUT WINDOW ENROLLMENT PERIOD R |
7/3/2019 |
| |
ADV 977 [PDF]
|
PGE ADVICE NO. 19-13, SCHEDULE 6 |
6/5/2019 |
| |
ADV 958 [PDF]
|
PORTLAND GENERAL ELECTRIC ADVICE 19-12 COMMUNITY SOLAR STARTUP COST RECOVERY |
4/18/2019 |
| |
ADV 946 [PDF]
|
PGE UPDATES RULE F RELATED TO EQUAL PAY PLAN, ADVICE NO. 19-11 |
3/29/2019 |
| |
ADV 944 [PDF]
|
PGE UPDATES IBEW LOCAL 125 LABOR RATES IN ADVICE NO. 19-09 |
3/20/2019 |
| |
ADV 943 [PDF]
|
PGE ADVICE NO. 19-08 UPDATES SCHEDULE 5 |
3/18/2019 |
| |
ADV 936 [PDF]
|
PGE UPDATETO STREET AND AREA LIGHTING SERVICE OPTIONS ADVICE NO. 19-07 |
3/8/2019 |
| |
ADV 935 [PDF]
|
PGE ADVICE NO. 19-06 SCHEDULE 55 GEAR |
3/6/2019 |
| |
ADV 935 [PDF]
|
PGE ADVICE NO. 19-06 SCHEDULE 55 GEAR |
3/6/2019 |
| |
ADV 928 [PDF]
|
PGE SCHEDULE 128 SHORT TERM TRANSITION ADJUSTMENT UPDATE ADVICE NO. 19-04 |
2/15/2019 |
| |
ADV 929 [PDF]
|
PGE COST RECOVERY MECHANISM FOR TRANSPORTATION ELECTRIFICATION PILOTS |
2/15/2019 |
| |
ADV 920 [PDF]
|
PGE'S FLEXIBLE RESIDENTIAL PRICING PROGRAM ADVICE NO. 19-03 SCHEDULE 7 |
2/8/2019 |
| |
ADV 919 [PDF]
|
PGE - NEW LOAD DIRECT ACCESS PROGRAM |
2/5/2019 |
| |
ADV 911 [PDF]
|
PGE ADVICE NO. 19-01 RULE K |
1/11/2019 |
| |
UM 1991 [PDF]
|
PGE DEFERRAL OF RESEARCH AND DEVELOPMENT TAX CREDITS |
12/18/2018 |
| |
UM 1988 [PDF]
|
PGE'S DEFERRAL OF COSTS ASSOCIATED WITH QF COMMERCIAL OPERATION DATES |
12/14/2018 |
| |
UM 1986 [PDF]
|
PGE DEFERRAL OF COSTS TO SUPPORT THE USE OF BALANCING ACCOUNTS |
12/7/2018 |
| |
UM 1986 [PDF]
|
PGE DEFERRAL OF COSTS TO SUPPORT THE USE OF BALANCING ACCOUNTS |
12/7/2018 |
| |
ADV 893 [PDF]
|
PGE ADV. NO. 18-25, NEW SCHED. 132 FEDERAL TAX REFORM CREDIT |
11/30/2018 |
| |
ADV 886 [PDF]
|
PGE UM 779 COMPLIANCE LATE PAYMENT RATE & INTEREST ACCRUED ON CUSTOMER DEPOSITS |
11/27/2018 |
| |
ADV 884 [PDF]
|
PGE SCHEDULE 128 SHORT TERM TRANSITION ADJUSTMENT |
11/15/2018 |
| |
ADV 882 [PDF]
|
PGE ADVICE NO. 18-21 REGIONAL POWER ACT EXCHANGE CREDIT |
11/13/2018 |
| |
ADV 883 [PDF]
|
PGE ADVICE NO. 18-22 MISC. REGULATORY ADJUSTMENTS SCHEDULE 105 |
11/13/2018 |
| |
ADV 869 [PDF]
|
PGE SCHEDULE 143 SPENT FUEL ADJUSTMENT |
11/9/2018 |
| |
ADV 871 [PDF]
|
PGE MULTNOMAH COUNTY BUSINESS INCOME TAX (MCBIT) |
11/9/2018 |
| |
ADV 868 [PDF]
|
PGE SCHEDULE 135 DEMAND RESPONSE COST RECOVERY MECHANISM |
11/8/2018 |
| |
ADV 862 [PDF]
|
PGE ADVICE NO. 18-16, SCHEDULE 123 DECOUPLING ADJUSTMENT |
11/1/2018 |
| |
ADV 867 [PDF]
|
PGE'S ADVICE NO. 18-17 SCHEDULE 145 BOARDMAN DECOMMISSIONING |
11/1/2018 |
| |
ADV 861 [PDF]
|
PGE'S REQUEST TO DECREASE COST-EFFECTIVE ENERGY EFFICIENCY FUNDING FOR ETO |
10/31/2018 |
| |
ADV 859 [PDF]
|
PGE Opt-Out Residential Demand Response Testbed Pilot and Application SCH. 13 |
10/25/2018 |
| |
ADV 856 [PDF]
|
PGE ENERGY EFFICIENCY CUSTOMER SERVICE ADJUSTMENT 2019 PRICES |
10/17/2018 |
| |
RE 179
|
PORTLAND GENERAL ELECTRIC ANNUAL REPORT SCHEDULE 54 |
10/11/2018 |
| |
ADV 846 [PDF]
|
PGE'S ADVICE NO. 18-12 SCHEDULE 26 ENERGY PAYMENT UPDATE |
10/10/2018 |
| |
ADV 831 [PDF]
|
PGE RETAIL ELECTRIC VEHICLE CHARGING RATES (ADV. NO. 18-11) |
9/21/2018 |
| |
UM 1966 [PDF]
|
PGE DEFERRAL OF THIRD-PARTY CONSULTING COSTS |
8/16/2018 |
| |
ADV 822 [PDF]
|
PGE'S ADVICE NO. 18-09 SCHEDULE 3 RESIDENTIAL DEMAND RESPONSE WATER HEATER PILOT |
8/16/2018 |
| |
ADV 811 [PDF]
|
PGE'S ADVICE NO. 18-08 2018 MULTI-YEAR OPT-OUT WINDOW ENROLLMENT PERIOD Q |
6/29/2018 |
| |
UM 1953
|
PORTLAND GENERAL ELECTRIC GREEN TARIFF FILING |
5/24/2018 |
| |
UM 1953 [PDF]
|
PORTLAND GENERAL ELECTRIC GREEN TARIFF FILING |
5/24/2018 |
| |
UM 1948 [PDF]
|
PGE DEFERRED ACCOUNTING OF CUSTOMER TOUCHPOINTS PROJECT COSTS |
5/11/2018 |
| |
UM 1938 [PDF]
|
PGE DEFERRED ACCOUNTING FOR COSTS/TRANSPORTATION ELECTRIFICATION PLAN |
4/23/2018 |
| |
ADV 763 [PDF]
|
PGE SCHEDULE 310 DEPOSITS FOR RESIDENTIAL CUSTOMERS UPDATE - NEW BILLING SYSTEM |
4/20/2018 |
| |
ADV 751 [PDF]
|
PGE ADV. NO. 18-06 EXTENDS RESIDENTIAL PRICING PILOT TERM TO JUNE 30 2019; SCH 6 |
3/23/2018 |
| |
ADV 750 [PDF]
|
PGE ADVICE NO. 18-05 RELATED TO TERMS POD AND PODID CHANGING TO SP AND SPID |
3/16/2018 |
| |
ADV 743 [PDF]
|
PGE HOUSEKEEPING CHANGES TO TARIFF ADVICE NO. 18-04 |
3/9/2018 |
| |
ADV 741 [PDF]
|
PGE IBEW LOCAL 125 LABOR RATE UPDATE |
3/2/2018 |
| |
ADV 727 [PDF]
|
PGE SCHEDULE 128 SHORT TERM TRANSITION ADJUSTMENT UPDATE APRIL 2018 WINDOW |
2/15/2018 |
| |
UM 1915 [PDF]
|
PGE DEFERRAL OF MAJOR MAINTENANCE EXPENSES |
12/22/2017 |
| |
UM 1912 [PDF]
|
PGE RESOURCE VALUE OF SOLAR |
12/4/2017 |
| |
ADV 675 [PDF]
|
PGE UM 779 COMPLIANCE LATE PAYMENT RATE & INTEREST ACCRUED ON CUSTOMER DEPOSITS |
11/30/2017 |
| |
ADV 665 [PDF]
|
PGE ADVICE NO. 17-32 SCHEDULE 115 |
11/20/2017 |
| |
ADV 659 [PDF]
|
PGE MISCELLANEOUS REGULATORY ADJUSTMENTS (SCHEDULE 105) |
11/17/2017 |
| |
ADV 658 [PDF]
|
PGE ADVICE NO. 17-30, SCHEDULES 128 AND 125 |
11/15/2017 |
| |
ADV 651 [PDF]
|
PGE ADVICE NO. 17-27 SCHEDULE 110 |
11/13/2017 |
| |
ADV 652 [PDF]
|
PGE ADVICE NO. 17-28 SCHEDULE 102 REGIONAL POWER ACT EXCHANGE CREDIT |
11/13/2017 |
| |
ADV 653 [PDF]
|
PGE ADVICE NO. 17-29, SCHEDULE 135 DEMAND RESPONSE COST RECOVERY MECHANISM |
11/13/2017 |
| |
ADV 650 [PDF]
|
PGE ADVICE 17-26 SCHEDULE 143 SPENT FUEL ADJUSTMENT |
11/8/2017 |
| |
ADV 649 [PDF]
|
PORTLAND GENERAL ELECTRIC (PGE) MULTNOMAH COUNTY BUSINESS INCOME TAX (MCBIT) |
11/3/2017 |
| |
ADV 648 [PDF]
|
PGE ADVICE 17-24 SCHEDULE 123 DECOUPLING ADJUSTMENT |
11/1/2017 |
| |
ADV 644 [PDF]
|
PORTLAND GENERAL ELECTRIC (PGE) BOARDMAN POWER PLANT DECOMMISSIONING ADJUSTMENT |
10/27/2017 |
| |
ADV 646 [PDF]
|
PGE DIRECT LOAD CONTROL AND DEMAND RESPONSE PILOT PROGRAMS SCHEDULES 25 & 26 |
10/27/2017 |
| |
RE 175
|
PGE CODE OF CONDUCT AUDITS 860-038-0640 COMPLIANCE |
10/13/2017 |
| |
ADV 635 [PDF]
|
PGE ADVICE NO. 17-20 RULE C |
10/11/2017 |
| |
ADV 636 [PDF]
|
PGE ADVICE NO. 17-21 UPDATES RULE E ESTABLISHING CREDIT/TREATMENT DEPOSITS |
10/11/2017 |
| |
ADV 631 [PDF]
|
PGE ADVICE NO. 17-19, SCHEDULE 20 METER INFORMATION SERVICES |
9/29/2017 |
| |
ADV 623 [PDF]
|
PGE SCHEDULE 115 LOW INCOME ASSISTANCE REMOVAL OF EXPIRATION DATE |
8/29/2017 |
| |
ADV 620 [PDF]
|
PGE ADVICE NO. 17-15 SCHEDULE 54 |
8/24/2017 |
| |
ADV 608 [PDF]
|
PGE TARIFF UPDATING RULE H TO COMPLY WITH AR 601 SEVERE WEATHER MORATORIUM |
7/14/2017 |
| |
ADV 599 [PDF]
|
PGE MULTI YEAR OPT OUT WINDOW ENROLLMENT PERIOD P |
6/30/2017 |
| |
ADV 588 [PDF]
|
PGE DIRECT LOAD CONTROL PILOT RIDER SCHEDULE 5 UPDATES |
6/21/2017 |
| |
ADV 564 [PDF]
|
PORTLAND GENERAL ELECTRIC COMPANY - SCHEDULE 800 SERVICE MAPS UPDATE |
5/16/2017 |
| |
ADV 555 [PDF]
|
PGE ADVICE NO. 17-10 ELIMINATING AVERAGE PAYMENT OPTION |
5/5/2017 |
| |
UM 1827 [PDF]
|
PGE DEFERRED COSTS OF DEMAND RESPONSE WATER HEATER PILOT |
4/18/2017 |
| |
ADV 528 [PDF]
|
PORTLAND GENERAL ELECTRIC COMPANY - SCHEDULE 149 |
3/2/2017 |
| |
ADV 526 [PDF]
|
PGE ADVICE NO. 17-07, IBEW LOCAL 125 LABOR RATE UPDATE |
3/1/2017 |
| |
ADV 523 [PDF]
|
PGE ADVICE NO. 17-05, SCHEDULE 134 - GRESHAM PRIVILEGE TAX PAYMENT ADJUSTMENT |
2/24/2017 |
| |
ADV 517 [PDF]
|
PGE ADVICE 17-04 REVISING SCHEDULES 7 AND 32 RENEWABLE DEVELOPMENT FUND UPDATE |
2/21/2017 |
| |
ADV 513 [PDF]
|
PGE ADVICE NO. 17-03 SCHEDULE 128 SHORT TERM TRANSITION ADJUSTMENT |
2/15/2017 |
| |
ADV 507 [PDF]
|
PORTLAND GENERAL ELECTRIC COMPANY - SCHEDULE 3 WATER HEATER PILOT |
2/3/2017 |
| |
ADV 498 [PDF]
|
PORTLAND GENERAL ELECTRIC COMPANY SCHEDULE 54 |
1/12/2017 |
| |
RE 174 [PDF]
|
PGE REPORT ON ELECTRIC VEHICLE HIGHWAY PILOT |
12/16/2016 |
| |
ADV 442 [PDF]
|
PORTLAND GENERAL ELECTRIC - LATE PAYMENT RATE / INTEREST RATE |
11/30/2016 |
| |
ADV 432 [PDF]
|
PGE ADVICE NO 16-22 SCHEDULE 109 |
11/23/2016 |
| |
ADV 429 [PDF]
|
PORTLAND GENERAL ELECTRIC - ANNUAL UPDATE TARIFF |
11/15/2016 |
| |
ADV 427 [PDF]
|
PORTLAND GENERAL ELECTRIC - SCHEDULE 105 |
11/10/2016 |
| |
ADV 425 [PDF]
|
PGE SCHEDULE 143 SPENT FUEL ADJUSTMENT |
11/9/2016 |
| |
ADV 420 [PDF]
|
PGE ADVICE NO. 16-18 SCHEDULE 102 REGIONAL POWER ACT EXCHANGE CREDIT |
11/2/2016 |
| |
ADV 410 [PDF]
|
PORTLAND GENERAL ELECTRIC COMPANY SCHEDULE 123 DECOUPLING ADJUSTMENT |
11/1/2016 |
| |
ADV 403 [PDF]
|
PORTLAND GENERAL ELECTRIC - BOARDMAN DECOMMISSIONING |
10/31/2016 |
| |
ADV 391 [PDF]
|
PGE ADVICE NO. 16-15 SCHEDULE 146 COLSTRIP POWER PLANT OPERATING LIFE ADJUSTMENT |
10/12/2016 |
| |
ADV 390 [PDF]
|
PGE MULTNOMAH COUNTY BUSINESS INCOME TAX (MCBIT) ADJUSTMENT |
10/7/2016 |
| |
UM 1789 [PDF]
|
PGE DEFERRAL OF COSTS RELATED TO SCHEDULE 149 |
7/15/2016 |
| |
ADV 337 [PDF]
|
PORTLAND GENERAL ELECTRIC - COST OF SERVICE OPT-OUT (ENROLLMENT PERIOD O) |
6/30/2016 |
| |
ADV 328 [PDF]
|
PORTLAND GENERAL ELECTRIC - STREET AND LIGHTING RATE SCHEDULES |
6/20/2016 |
| |
ADV 318 [PDF]
|
PORTLAND GENERAL ELECTRIC - SCHEDULES 7 & 32 INTEREST ACCRUED ON RENEWABLE DEVEL |
5/31/2016 |
| |
ADV 280 [PDF]
|
PGE HOUSEKEEPING CHANGES |
4/27/2016 |
| |
ADV 274 [PDF]
|
PORTLAND GENERAL ELECTRIC - SCHEDULE 54 |
4/14/2016 |
| |
ADV 264 [PDF]
|
PORTLAND GENERAL ELECTRIC COMPANY - SCHEDULES 125 & 126 |
3/31/2016 |
| |
ADV 263 [PDF]
|
PORTLAND GENERAL ELECTRIC - SCHEDULE 122 |
3/30/2016 |
| |
ADV 240 [PDF]
|
PGE ADVICE NO. 16-03, IBEW LOCAL 125 LABOR RATE UPDATE |
3/2/2016 |
| |
ADV 221 [PDF]
|
PORTLAND GENERAL ELECTRIC - COST OF SERVICE, DIRECT ACCESS |
2/16/2016 |
| |
ADV 156 [PDF]
|
PORTLAND GENERAL ELECTRIC - LATE PAYMENT RATE / INTEREST RATE |
11/30/2015 |
| |
ADV 147 [PDF]
|
PGE - SCHEDULE 6 RESIDENTIAL PRICING PILOT |
11/23/2015 |
| |
ADV 137 [PDF]
|
PGE - UPDATES SCHEDULES 77 AND 128, REFERENCE FUEL COSTS FOR 2016 |
11/16/2015 |
| |
ADV 138 [PDF]
|
PORTLAND GENERAL ELECTRIC - WITHDRAWAL OF SCHEDULE 730 |
11/16/2015 |
| |
ADV 135 [PDF]
|
PGE MISCELLANEOUS REGULATORY ADJUSTMENT UPDATE |
11/13/2015 |
| |
ADV 127 [PDF]
|
PGE ADVICE NO. 15-26 SCHEDULE 102 REGIONAL POWER ACT EXCHANGE CREDIT |
11/4/2015 |
| |
RE 167 [PDF]
|
PGE - DISCONNECTION REPORT REQUIRED BY HB 2599 |
10/30/2015 |
| |
ADV 123 [PDF]
|
PGE ADVICE NO. 15-25, SCHEDULE 123 DECOUPLING ADJUSTMENT |
10/29/2015 |
| |
ADV 121 [PDF]
|
PORTLAND GENERAL ELECTRIC BOARDMAN POWER PLANT DECOMMISSIONING ADJUSTMENT |
10/27/2015 |
| |
ADV 118 [PDF]
|
PORTLAND GENERAL ELECTRIC MCBIT RATE |
10/20/2015 |
| |
ADV 115 [PDF]
|
PGE SCHEDULE 5 DIRECT LOAD CONTROL PILOT RIDER |
10/12/2015 |
| |
ADV 110 [PDF]
|
PGE SCHEDULE 115 LOW INCOME ASSISTANCE |
9/24/2015 |
| |
ADV 104 [PDF]
|
PGE SOLAR PAYMENT OPTION PILOT |
9/18/2015 |
| |
ADV 94 [PDF]
|
PORTLAND GENERAL ELECTRIC ADDITION TO LED LIGHTING OPTIONS |
9/8/2015 |
| |
ADV 93 [PDF]
|
SCHEDULE 129 TRANSITION COST ADJUSTMENT RATE. |
8/31/2015 |
| |
ADV 64 [PDF]
|
PORTLAND GENERAL ELECTRIC COST OF SERVICE OPT-OUT |
6/30/2015 |
| |
ADV 62 [PDF]
|
PGE CHANGE REGARDING CANNABIS GROWERS AND THE RESIDENTIAL EXCHANGE CREDIT |
6/29/2015 |
| |
RE 161
|
PGE ANNUAL REPORT OF BILLS ADJUSTED |
6/23/2015 |
| |
ADV 50 [PDF]
|
PORTLAND GENERAL ELECTRIC ON-BILL REPAYMENT SERVICE |
5/28/2015 |
| |
ADV 48 [PDF]
|
PGE ADVICE 15-14 SCHEDULE 137 CUSTOMER-OWNED SPO COST RECOVERY MECHANISM |
5/22/2015 |
| |
ADV 37 [PDF]
|
PGE'S UPDATE TO SCHEDULE 105 FEE FREE BANK CARD PROGRAM |
5/12/2015 |
| |
UM 1728 [PDF]
|
PGE UPDATES TO SCHEDULE 201 QUALIFYING FACILITY (10 MW OR LESS) AVOIDED COST |
5/1/2015 |
| |
ADV 31 [PDF]
|
PGE ENERGY EFFICIENCY CLASSES TO NON-PGE BUSINESS CUSTOMERS |
4/27/2015 |
| |
RE 157 [PDF]
|
PORTLAND GENERAL ELECTRIC CLEAN WIND AND GREEN SOURCE |
4/17/2015 |
| |
ADV 21 [PDF]
|
PGE CLARIFICATION TO RULE C - CUSTOMER ATTACHMENT TO FACILITIES |
4/3/2015 |
| |
ADV 23 [PDF]
|
PGE RENEWABLE SOLAR OPTION |
4/3/2015 |
| |
ADV 19 [PDF]
|
PGE UPDATE TO SOLAR PAYMENT OPTION PILOT THE VIR |
4/2/2015 |
| |
ADV 3
|
PORTLAND GENERAL ELECTRIC COMPANY IBEW LABOR RATES |
3/4/2015 |
| |
ADV 3 [PDF]
|
PORTLAND GENERAL ELECTRIC COMPANY IBEW LABOR RATES |
3/4/2015 |
| |
RE 154 [PDF]
|
PORTLAND GENERAL ELECTRIC FEE FREE BANK CARD PROGRAM |
3/2/2015 |
| |
RE 151
|
PORTLAND GENERAL ELECTRIC CUSTOM CONTRACTS SCHEDULE 320 |
10/30/2014 |
| |
RE 145
|
PORTLAND GENERAL ELECTRIC IRS FORM 3115 |
9/25/2014 |
| |
RE 145 [PDF]
|
PORTLAND GENERAL ELECTRIC IRS FORM 3115 |
9/25/2014 |
| |
RE 139
|
PORTLAND GENERAL ELECTRIC ETO ANNUAL REPORT |
5/22/2014 |
| |
RE 137 [PDF]
|
PORTLAND GENERAL ELECTRIC - MAJOR RESOURCE ACQUISITION |
4/21/2014 |
| |
RE 131
|
PGE BILLING ERROR ANNUAL REPORT/OAR 860-021-0170 |
2/24/2014 |
| |
RE 130
|
PGE/ESTIMATES OF THE SOLAR PHOTOVOLTAIC PILOT PROGRAM RESOURCE VALUE/UM 1559 |
1/22/2014 |
| |
RE 126
|
PGE/AUTOMATED DEMAND RESPONSE INTERIM REPORT |
11/12/2013 |
| |
RE 124
|
PGE/CITY OF WOODBURN POLE SALES/UP 292 |
11/8/2013 |
| |
RE 122
|
PGE/REPORT OF SECURITIES AND DISPOSITION OF NET PROCEEDS/UF 4276 |
10/4/2013 |
| |
RE 121
|
PGE/REPORT OF SECURITIES ISSUED AND DISPOSITION OF NET PROCEEDS/UF 4266 |
9/13/2013 |
| |
RE 120
|
PORTLAND GENERAL ELECTRIC/HEAT PUMP CAMPAIGN |
8/29/2013 |
| |
RE 119
|
PGE/RESULTS OF OPERATIONS |
6/26/2013 |
| |
RE 118
|
PGE SALE OF SE 32ND AVE PROPERTY 6-24-13 |
6/24/2013 |
| |
RE 117
|
PGE/SALE TO TRI-MET |
6/21/2013 |
| |
RE 113
|
PGE ANNUAL RELIABILITY REPORT |
4/30/2013 |
| |
RE 111
|
PGE NET METERING ALTERNATE BILLING CYCLE REQUEST |
4/29/2013 |
| |
RE 112
|
PGE/MAJOR STORM EVENT REPORTING/OAR 860-023-0161 |
4/29/2013 |
| |
RE 110
|
PGE/FIXED RENEWABLE OPTION RES DEV FUND, SCH 9 STABLE RATE PILOT, WIND DEV FUND |
4/24/2013 |
| |
RE 104
|
PGE/QUARTERLY REVOLVING CREDIT REPORT/UF 4268/UF 4272/UF 4277 |
3/1/2013 |
| |
RE 105
|
PGE/QUARTERLY ACTIVITY REPORT/UF 4239 |
3/1/2013 |
| |
RE 106
|
PGE/ENERGY EFFICIENCY LIGHTING UPGRADE SWEEPSTAKES |
3/1/2013 |
| |
RE 103
|
PGE/DIVIDEND REINVESTMENT AND DIRECT STOCK PURCHASE PLAN ACTIVITY REPORT (DRIP & |
2/28/2013 |
| |
RE 97
|
PGE/SOLAR PHOTOVOLTAIC PILOT PROGRAM RATE IMPACT ESTIMATE |
11/2/2012 |
| |
RE 93
|
PGE/COMPANY METER TEST & INSPECTION |
9/20/2012 |
| |
RE 91
|
PGE/OREGON SOLAR INCENTIVE PILOT PROGRAM, BI-ANNUAL REPORT/OAR 860-084-0430 |
8/29/2012 |
| |
RE 85
|
PGE/AMI OPERATIONAL SAVINGS REPORT/UE 189 |
7/31/2012 |
| |
RE 82
|
PGE HOURLY MARGINAL COST ESTIMATES |
7/9/2012 |
| |
RE 79
|
PGE UNUSED ENERGY REPORT FOR NET METERING FACILITIES |
6/29/2012 |
| |
RE 80
|
PGE/ESTIMATE OF 2020 CO2 REDUCTION |
6/29/2012 |
| |
RE 81
|
PGE B1 SQM FOR BILLING ACCURACY ANNUAL REPORT |
6/29/2012 |
| |
RE 77
|
PGE BOARDMAN DECOMMISSIONING UPDATE 2012 |
6/14/2012 |
| |
RE 73
|
PGE/ELECTRICITY PRODUCT CLAIM RECONCILIATION REPORT OAR 860-038-0300(11) |
6/1/2012 |
| |
RE 67
|
PORTLAND GENERAL ELECTRIC ANNUAL SMALL GENERATOR INTERCONNECTION REPORT |
5/30/2012 |
| |
RE 64
|
PORTLAND GENERAL ELECTRIC - AFFILIATED INTEREST REPORT/OAR 860-027-0100 |
5/29/2012 |
| |
RE 65
|
PORTLAND GENERAL ELECTRIC ANNUAL PROPERTY SALES REPORT |
5/29/2012 |
| |
RE 61
|
PORTLAND GENERAL ELECTRIC 2011 SERVICE QUALITY MEASURES/UM 814 |
5/8/2012 |
| |
RE 54
|
PGE/ANNUAL REPORT FERC FORM 1 |
4/27/2012 |
| |
RE 46
|
PGE PROMOTIONAL ACTIVITIES AND CONCESSIONS EXPENDITURES |
4/4/2012 |
| |
RE 45
|
PGE NET METERING REPORT/OAR 860-039-0070(2) |
3/30/2012 |
| |
RE 34
|
PGE MAJOR SHAREHOLDER REPORT |
2/29/2012 |
| |
RE 29
|
PGE/SOLAR PAYMENT OPTION PILOT PROGRAM BI-ANNUAL REPORT |
2/15/2012 |
| |
RE 27
|
PGE/COP STIPULATION IN DOCKET UE 215 |
1/19/2012 |
| |
RE 24
|
PGE/$300 MILLION REVOLVING REPORT/UF 4268 |
1/18/2012 |
| |
RE 23
|
PGE/QUARTERLY REPORT/UF 4268 |
1/17/2012 |
| |
RE 18
|
PORTLAND GENERAL ELECTRIC/NEW CONSTRUCTION BUDGET |
12/28/2011 |
| |
RE 19
|
PGE/ANNUAL BUDGET OF EXPENDITURES |
12/28/2011 |
| |
RE 15
|
PGE/POWER PURCHASE AGREEMENT FOR QF |
11/30/2011 |
| |
RE 143
|
PGE - QUALIFYING FACILITY CONTRACTS |
11/30/2011 |
| |
RE 13
|
PGE/CUSTOMER & SYSTEMS RELATED BENEFITS QUARTERLY REPORT/UE 189 |
11/14/2011 |
| |
RE 9
|
PGE/REVOLVING CREDIT QUARTERLY REPORT/UF 4261 |
10/27/2011 |
| |
RE 10
|
PGE/REVOLVING CREDIT QUARTERLY REPORT/UF 4216 |
10/27/2011 |
| |
RE 11
|
PGE/QUARTERLY REVOLVING CREDIT REPORT/UF 4258 |
10/27/2011 |
| |
RE 6
|
PGE LOW INCOME ASSISTANCE STATEMENT OF ACTIVITY |
10/24/2011 |
| |
RE 7
|
PORTLAND GENERAL ELECTRIC/PUBLIC PURPOSE CHARGE STATEMENT OF ACTIVITY |
10/24/2011 |
| |
RE 5
|
PGE AUT MONET UPDATE |
9/30/2011 |
| |
RE 4
|
PORTLAND GENERAL ELECTRIC POWER COST UPDATE/ UM 1294 COMPLIANCE FILINGS |
9/27/2011 |
| |
RE 1
|
PGE/SMART GRID REPORT/UM 1460 |
9/22/2011 |
| |
UM 1482 [PDF]
|
PORTLAND GENERAL ELECTRIC |
5/6/2010 |
| |
UM 1422 [PDF]
|
PORTLAND GENERAL ELECTRIC COMPANY |
2/27/2009 |
| |
UM 1384 [PDF]
|
PORTLAND GENERAL ELECTRIC |
6/18/2008 |
| |
UM 1301 [PDF]
|
PORTLAND GENERAL ELECTRIC |
2/1/2007 |
| |
UM 1294 [PDF]
|
PORTLAND GENERAL ELECTRIC COMPANY |
1/17/2007 |
| |
UM 1103
|
PORTLAND GENERAL ELECTRIC DEFERRAL - INTERVENOR FUNDING COSTS |
8/11/2003 |
| |