Sort By Date
Sort By Type
|
Date: |
1/20/2023 |
Action: OTHER CORRESPONDENCE (ACKN, SVC, LTR) |
|
|
Description
Proof of service of letter 01/19/2023. |
Date: |
1/19/2023 |
Action: ACCEPTED UTILITY FILING |
|
|
Description
Letter sent. |
Date: |
1/19/2023 |
Action: OTHER CORRESPONDENCE (ACKN, SVC, LTR) |
|
|
Description
Staff Memo to file recommending acknowledgement letter be sent filed by Bret Stevens. |
Date: |
1/6/2023 |
Action: REPLACEMENT SHEETS, EXTENSION |
|
|
Description
PGE Second Supplemental Filing of Advice No. 22-35, Annual Update. PGE is submitting this Second Supplemental Filing to correct errors that were discovered in the Fourteenth Revision of Sheet No. 7-3 to the Mid-Peak Charge and in the Ninth Revision of Sheet No. 7-4 to the On-Peak and Mid-Peak Charges. Although the total prices are listed incorrectly, customers are being charged the correct price because the individual prices for energy, transmission, and distribution are correct. Therefore, PGE is submitting revised tariff sheets with the corrected total price with a requested effective date of January 19, 2023. This filing includes a Less Than Statutory Notice (LSN). |
Date: |
12/23/2022 |
Action: OTHER CORRESPONDENCE (ACKN, SVC, LTR) |
|
|
Description
Proof of service of letter 12/22/2022. |
Date: |
12/22/2022 |
Action: ACKNOWLEDGED UTILITY FILING |
|
|
Description
Letter sent. |
Date: |
12/22/2022 |
Action: OTHER CORRESPONDENCE (ACKN, SVC, LTR) |
|
|
Description
Staff Memo to file recommending acknowledgement letter be sent filed by Bret Stevens. |
Date: |
12/22/2022 |
Action: STAFF REPORT |
|
|
Description
Staff Report for the December 27, 2022 Public Meeting (Item No. RA3), by Bret Stevens. |
Date: |
12/6/2022 |
Action: REPLACEMENT SHEETS, ADDITIONAL MATERIAL |
|
|
Description
PGE Supplemental Filing of Advice No. 22-35, Annual Update Tariff. PGE initially filed Advice No. 22-35 on November 15, 2022, with a requested effective date of January 1, 2023, which remains as filed. PGE is submitting this Supplemental Filing to correct a miskey to the Distribution Charge in Schedule 38. The filing also includes a Less Than Statutory Notice (LSN). |
Date: |
11/15/2022 |
Action: INITIAL UTILITY FILING |
|
|
Description
PGE Advice No. 22-35, Annual Update Tarif. The purpose of this filing is to revise Schedules 26 and 125 consistent with the final net variable power costs (NVPC) determined in Docket No. UE 402. In addition, PGE resets the numerous System Usage, Distribution, and lighting fixture charges contained in PGE's base rate schedules consistent with the Special Conditions contained in Schedule 129. |