|
|
Sort By Date
Sort By Type
|
Date: |
12/10/2024 |
Action: OTHER CORRESPONDENCE (ACKN, SVC, LTR) |
|
|
Description
Proof of service of letter 12/10/2024. |
Date: |
12/10/2024 |
Action: ALLOWED (APPROVED) UTILITY FILING |
|
|
Description
Letter sent. |
Date: |
12/5/2024 |
Action: STAFF REPORT |
|
|
Description
Staff Report for the December 10, 2024 Public Meeting (Item No. CA5), by Ming Peng. |
Date: |
11/6/2024 |
Action: REPLACEMENT SHEETS, ADDITIONAL MATERIAL |
|
|
Description
PGE Supplemental Filing of Advice No. 24-28, Schedule 146 Colstrip Power Plant Operating Life Adjustment. PGE is submitting this Supplemental Filing because it discovered that the Generation Base Revenues (which are used to allocate the Schedule 146 Revenue Requirement) for Schedules 89-P were calculated using the Schedule 85-P Net Variable Power Cost (NVPC) prices instead of the Schedule 89-P NVPC prices. This filing corrects the calculations, so that all Generation Base Revenues for these Schedules are correctly calculated. |
Date: |
11/1/2024 |
Action: INITIAL UTILITY FILING |
|
|
Description
PGE Advice No. 24-28, Schedule 146 Colstrip Power Plant Operating Life Adjustment. The purpose of this filing is to adjust Customer rates for recovery of the 2025 revenue requirement for PGE's ownership share of the Colstrip generation plant. |