eDockets
Docket Summary
Return to Search Page eFiling

Docket No:  ADV 1198 Docket Name:  PGE ADVICE NO. 20-38 ANNUAL UPDATE TARIFF Submit Public Comment
Subject Company:  PORTLAND GENERAL ELECTRIC    
PGE's Advice No. 20-38. The purpose of this filing is to revise Schedules 26 and 125 consistent with the final net variable power costs (NVPC) of $457.9 million determined in Docket No. UE 377. In addition, PGE resets the numerous System Usage,...
Filing Date:  11/16/2020 Advice No: 20-38    Public Mtg: 12/29/2020   
Effective:  1/1/2021 Expiration:   Status:  ALLOWED
Case Manager:  SABRINNA SOLDAVINI Phone:  (503) 378-8714
Email:   sabrinna.soldavini@puc.oregon.gov
  If you experience problems with the above 'Email Service List' links,
please try one of these:
Service List Popup (semi-colon delimited)     Service List Popup (comma delimited)

ACTIONSSERVICE LISTSCHEDULE Public Comments
Sort By Date        Sort By Type
Date: 12/29/2020 Action:  OTHER CORRESPONDENCE (ACKN, SVC, LTR)  Searchable Doc  
  Description
Proof of service of 12/29/20 letter 
Date: 12/29/2020 Action:  ALLOWED (APPROVED) UTILITY FILING  Searchable Doc  
  Description
Letter sent. 
Date: 12/23/2020 Action:  STAFF REPORT  Searchable Doc  
  Description
PGE ADV 1198 - Staff Report for the December 29, 2020 Public Meeting [Item No. CA12] by Sabrinna Soldavini 
Date: 12/9/2020 Action:  REPLACEMENT SHEETS, ADDITIONAL MATERIAL  Searchable Doc  
  Description
PGE Second Supplemental Filing of Advice No. 20-38, corrects pricing in Schedule 515. All other sheets remain as previously filed. This filing also includes a Less than Statutory Notice (LSN). 
Date: 11/19/2020 Action:  REPLACEMENT SHEETS, ADDITIONAL MATERIAL  Searchable Doc  
  Description
PGE is submitting this Supplemental Filing to include the system usage charge change in Schedule 689, New Large Load Cost-of Service Opt-Out that was inadvertently not included in the initial filing. 
Date: 11/16/2020 Action:  INITIAL UTILITY FILING  Searchable Doc  
  Description
PGE's Advice No. 20-38. The purpose of this filing is to revise Schedules 26 and 125 consistent with the final net variable power costs (NVPC) of $457.9 million determined in Docket No. UE 377. In addition, PGE resets the numerous System Usage, Distribution, and lighting fixture charges contained in PGE's base rate schedules consistent with the Special Conditions contained in Schedule 129.