Sort By Date
Sort By Type
|
Date: |
10/31/2024 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
PGE Monthly Power Cost Update for September 2024.
Confidential Saved to Agency Folder |
Date: |
9/30/2024 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
PGE Monthly Power Cost Update for August 2024.
Confidential Saved to Agency Folder |
Date: |
8/30/2024 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
PGE Monthly Power Cost Update for July 2024.
Confidential Saved to Agency Folder |
Date: |
7/31/2024 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
PGE Monthly Power Cost Update for June 2024.
Confidential Saved to Agency Folder |
Date: |
6/28/2024 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
PGE Monthly Power Cost Update for May 2024.
Confidential Saved to Agency Folder |
Date: |
5/31/2024 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
PGE Monthly Power Cost Update for April 2024. Confidential Saved to Agency Folder |
Date: |
4/30/2024 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
PGE Monthly Power Cost Update for March 2024.
Confidential Saved to Agency Folder |
Date: |
3/29/2024 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
PGE Monthly Power Cost Update for February 2024.
Confidential Saved to Agency Folder |
Date: |
2/28/2024 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
PGE Monthly Power Cost Update for January 2024.
Confidential Saved to Agency Folder |
Date: |
1/31/2024 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
PGE Monthly Power Cost Update for December 2023.
Confidential to Agency Folder |
Date: |
1/2/2024 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
PGE Monthly Power Cost Update for November 2023.
Confidential to Agency Folder |
Date: |
11/29/2023 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
PGE Monthly Power Cost Update for October 2023.
Confidential Excel spreadsheets are saved in Agency Folder. |
Date: |
10/25/2023 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
PGE Monthly Power Cost Update for September 2023.
Confidential Excel spreadsheets are saved in Agency Folder. |
Date: |
9/25/2023 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
PGE Monthly Power Cost Update for August 2023.
Confidential Excel spreadsheets are saved in Agency Folder. |
Date: |
8/16/2023 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
PGE Monthly Power Cost Update for July 2023.
Confidential and Excel spreadsheet are saved in Agency Folder. |
Date: |
7/25/2023 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
PGE Monthly Power Cost Update for June 2023.
Confidential and Excel spreadsheet are saved in Agency Folder. |
Date: |
6/27/2023 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
PGE Monthly Power Cost Update for May 2023.
Confidential and Excel spreadsheet are saved in Agency Folder. |
Date: |
4/28/2023 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
PGE Monthly Power Cost Update for March 2023.
Confidential Saved in Agency Folder. |
Date: |
4/3/2023 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
PGE Monthly Power Cost Update for February 2023.
Confidential Saved in Agency Folder. |
Date: |
2/28/2023 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
PGE Monthly Power Cost Update for January 2023.
Confidential Saved in Agency Folder. |
Date: |
1/31/2023 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
PGE Monthly Power Cost Update for December 2022.
Confidential saved in agency folder |
Date: |
12/28/2022 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
PGE Monthly Power Cost Update for November 2022.
Confidential processed to agency folder |
Date: |
11/30/2022 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
PGE Monthly Power Cost Update for October 2022.
Confidential processed to agency folder |
Date: |
10/25/2022 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
PGE Monthly Power Cost Update for September 2022.
Confidential processed to agency folder |
Date: |
9/30/2022 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
PGE Monthly Power Cost Update for August 2022.
Confidential Saved in Agency Folder. |
Date: |
8/30/2022 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
PGE Monthly Power Cost Update for July 2022.
Confidential Saved in Agency Folder. |
Date: |
7/29/2022 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
PGE Monthly Power Cost Update for June 2022.
Confidential Saved in Agency Folder. |
Date: |
6/29/2022 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
PGE Monthly Power Cost Update for May 2022.
Confidential Saved in Agency Folder. |
Date: |
5/26/2022 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
PGE Monthly Power Cost Update for April 2022.
Confidential Saved in Agency Folder. |
Date: |
4/28/2022 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
PGE's Monthly Power Cost Update for March 2022.
(Confidential Saved in Agency Folder.) |
Date: |
3/30/2022 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
PGE's Monthly Power Cost Update for February 2022.
Confidential processed to Agency Folder |
Date: |
2/28/2022 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
PGE's Monthly Power Cost Update for January 2022.
(Protected Information processed.) |
Date: |
1/25/2022 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
PGE's Monthly Power Cost Update for December 2021.
(Protected Information processed.) |
Date: |
12/29/2021 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
PGE's Monthly Power Cost Update for November 2021.
(Protected Information processed.) |
Date: |
11/29/2021 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
PGE's Monthly Power Cost Update for October 2021 |
Date: |
10/4/2021 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
PGE's Monthly Power Cost Report for September 2021. |
Date: |
9/30/2021 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
PGE's Monthly Power Cost Report for August 2021.
(Protected Information processed.) |
Date: |
9/1/2021 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
PGE's Monthly Power Cost Report for July 2021.
Confidential filing in Agency folder |
Date: |
7/29/2021 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
PGE's Monthly Power Cost Report for June 2021.
Confidential filing in Agency folder |
Date: |
6/29/2021 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (115) PGE's Annual Power Cost Variance Deferral Report for April 2021. |
Date: |
5/25/2021 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
PGE's Annual Power Cost Variance Deferral Report CORRECTED ATTACHMENT |
Date: |
4/21/2021 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (114) PGE's Annual Power Cost Variance Deferral Report for March 2021.
(Protected Information processed.) |
Date: |
3/23/2021 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (113) PGE's Annual Power Cost Variance Deferral Report for February 2021.
(Protected Information processed.) |
Date: |
2/24/2021 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (112) - PGE's Annual Power Cost Variance Deferral Report for January 2021.
(Protected Information processed.) |
Date: |
1/19/2021 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (111) - PGE's Annual Power Cost Variance Deferral Report for December 2020.
(Protected Information processed.) |
Date: |
12/16/2020 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (110) - PGE's Annual Power Cost Variance Deferral Report for November 2020.
(Protected Information processed.) |
Date: |
11/25/2020 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (109) - PGE's Annual Power Cost Variance Deferral Report for October 2020.
(Confidential to locked cabinet, Env. no. 690(67)) |
Date: |
10/20/2020 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (108) - PGE's Annual Power Cost Variance Deferral Report for September 2020.
(Confidential to locked cabinet, Env. no. 690(66)) |
Date: |
9/14/2020 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (107) - PGE's Annual Power Cost Variance Deferral Report for August 2020.
Confidential saved in agency folder |
Date: |
8/14/2020 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (106) - PGE's Annual Power Cost Variance Deferral Report for July 2020.
(Confidential to locked cabinet, Env. no. 690(65) |
Date: |
7/15/2020 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (105) - PGE's Annual Power Cost Variance Deferral Report for June 2020.
(Confidential to locked cabinet, Env. no. 690(64)) |
Date: |
6/15/2020 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (104) - PGE's Annual Power Cost Variance Deferral Report for January - May 2020.
Confidential to locked cabinet, env. no. 690(63) |
Date: |
5/15/2020 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (103) - PGE's Annual Power Cost Variance Deferral Report for January - April 2020.
Confidential to locked cabinet, env. no. 690(62)
|
Date: |
4/27/2020 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (102) - PGE's Amended Annual Power Cost Variance Deferral Report for January - March 2020.
Confidential to locked cabinet, env. no. 690(61)
|
Date: |
3/20/2020 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (102) - PGE's Annual Power Cost Variance Deferral Report for January - February 2020.
Confidential to locked cabinet, env. no. 690(60) |
Date: |
2/28/2020 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (101) - PGE's Annual Power Cost Variance Deferral Report for January 2020
Confidential to locked cabinte, env. no. 690(59) |
Date: |
1/28/2020 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (100) - PGE's Annual Power Cost Variance Deferral Report for January-December 2019.
Confidential to locked cabinet #690(58). |
Date: |
12/30/2019 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (99) - PGE's Annual Power Cost Variance Deferral Report for January-November 2019.
Confidential to locked cabinet #690(57). |
Date: |
11/26/2019 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (98) - PGE's Annual Power Cost Variance Deferral Report for January-October 2019.
Confidential to locked cabinet #690(56). |
Date: |
10/31/2019 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (97) - PGE's Annual Power Cost Variance Deferral Report for January-September 2019.
Confidential to locked cabinet #690(55). |
Date: |
9/27/2019 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (96) - PGE's Annual Power Cost Variance Deferral Report for January-August 2019.
Confidential to locked cabinet #690(54). |
Date: |
8/30/2019 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (95) - PGE's Annual Power Cost Variance Deferral Report for January-July 2019.
Confidential to locked cabinet #690(53). |
Date: |
7/31/2019 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (94) - PGE's Annual Power Cost Variance Deferral Report for January-June 2019.
Confidential to locked cabinet #690(52) |
Date: |
6/21/2019 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (93) - PGE's Annual Power Cost Variance Deferral Report for May 2019.
Confidential to Locked Cabinet #960 (51) |
Date: |
5/29/2019 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (92) - PGE's Annual Power Cost Variance Deferral Report for January-April 2019.
Confidential to locked cabinet # 690(51). |
Date: |
5/2/2019 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (91) - PGE's Annual Power Cost Variance Deferral Report for January-March 2019.
Confidential CD and attachment 1 to locked cabinet in Env. 690 (50) |
Date: |
3/20/2019 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (90) - PGE's Annual Power Cost Variance Deferral Report for January-February 2019.
Confidential envelope in locked cabinet, Env. #690(49). |
Date: |
2/21/2019 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (89) - PGE's Annual Power Cost Variance Deferral Report for January 2019.
Confidential in locked cabinet, Env. #690(48) |
Date: |
1/30/2019 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (88) - PGE's Annual Power Cost Variance Deferral Report for January thru December 2018.
Confidential in locked cabinet, Env. #690(47) |
Date: |
12/19/2018 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (87) - PGE's Annual Power Cost Variance Deferral Report for January thru November 2018.
Confidential in locked cabinet, env. no. 690(46) |
Date: |
11/27/2018 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (86) - PGE's Annual Power Cost Variance Deferral Report for January thru October 2018.
Confidential in locked cabinet, env. no. 690(45) |
Date: |
10/31/2018 |
Action: OTHER FILING/PLEADING |
|
|
Description
RE 4 (83 and 84) Correction - PGE's Annual Power Cost Variance Deferral Report for January thru July and August 2018, with corrections. Confidential to locked cabinet #690(44) |
Date: |
10/31/2018 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (85) - PGE's Annual Power Cost Variance Deferral Report for January thru September 2018. Confidential to locked cabinet #690(44)
|
Date: |
9/24/2018 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (84) - PGE's Annual Power Cost Variance Deferral Report for January thru August 2018.
|
Date: |
8/23/2018 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (83) - PGE's Annual Power Cost Variance Deferral Report for January thru July 2018.
[Confidential pages and CD in locked cabinet, Env. No. 690(42)] |
Date: |
7/30/2018 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (82) - PGE's Annual Power Cost Variance Deferral Report for January thru June 2018.
Confidential pages in locked cabinet, Env #690(41) |
Date: |
6/29/2018 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (81) - PGE's Annual Power Cost Variance Deferral Report for January thru May 2018. Confidential to locked cabinet #690(40). |
Date: |
5/16/2018 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (80) - PGE's Annual Power Cost Variance Deferral Report for January thru April 2018. Confidential to locked cabinet #690(39). |
Date: |
4/26/2018 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (79) - PGE's Annual Power Cost Variance Deferral Report for January thru March 2018. Confidential to locked cabinet #690(38). |
Date: |
3/21/2018 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (78) - PGE's Annual Power Cost Variance Deferral Report for January and February 2018. Confidential to locked cabinet #690(37). |
Date: |
2/22/2018 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (77) - PGE's Annual Power Cost Variance Deferral Report for January 2018. Confidential to locked cabinet #690(36). |
Date: |
1/23/2018 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (76) - PGE's Annual Power Cost Variance Deferral Report for January-December 2017.
[Confidential to locked cabinet #690(35)] |
Date: |
12/27/2017 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (75) - PGE's Annual Power Cost Variance Deferral Report for January-November 2017. [Confidential to locked cabinet #690(34)] |
Date: |
11/21/2017 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (74) - PGE's Annual Power Cost Variance Deferral Report for January-October 2017. Confidential to locked cabinet #690(33) |
Date: |
10/20/2017 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (73) - PGE's Annual Power Cost Variance Deferral Report for January-September 2017.
Confidential to locked cabinet #690(32) |
Date: |
9/25/2017 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (72) - PGE's Annual Power Cost Variance Deferral Report for January-August 2017.
[Confidential attachments in locked cabinet,e nv. no. 690(31)] |
Date: |
8/14/2017 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (71) - PGE's Annual Power Cost Variance Deferral Report for January-July 2017. Confidential to locked cabinet #690(30). |
Date: |
7/18/2017 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (70) - PGE's Annual Power Cost Variance Deferral Report for June 2017. Confidential to locked cabinet #690(29). |
Date: |
6/22/2017 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (69) - PGE's Annual Power Cost Variance Deferral Report for May 2017. Confidential to locked cabinet #690(28) |
Date: |
5/24/2017 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (68) - PGE's Annual Power Cost Variance Deferral Report for April 2017. (Confidential attachments to locked cabinet #690(27) on 5/30/17.) |
Date: |
4/26/2017 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (67) - PGE's Annual Power Cost Variance Deferral Report for March 2017. (4/28/17 - Confidential rec'd to locked cabinet #690(26)).
|
Date: |
3/27/2017 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (66) - PGE's Annual Power Cost Variance Deferral Report for February 2017.
(Confidential attachments to locked cabinet #690(25) on 3/29/17.) |
Date: |
2/21/2017 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (65) - PGE's Annual Power Cost Variance Deferral Report for January 2017. (Confidential attachments to locked cabinet #690(24) on 2/23/17.) |
Date: |
1/19/2017 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (64)--PGE's Annual Power Cost Variance Deferral Report for January-December 2016. (CONFIDENTIAL Attachments are located in locked cabinet, env. no. 690(23)). |
Date: |
12/20/2016 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (63)--PGE's Annual Power Cost Variance Deferral Report for January-November 2016. CONFIDENTIAL Attachments are located in locked cabinet, env. no. 690(22)). |
Date: |
11/22/2016 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (62)--PGE's Annual Power Cost Variance Deferral Report for January-October 2016. CONFIDENTIAL Attachments are located in locked cabinet, env. no. 690(21)). |
Date: |
10/19/2016 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (61)--PGE's Annual Power Cost Variance Deferral Report for January-September 2016.CONFIDENTIAL Attachments are located in locked cabinet, env. no. 690(20)). |
Date: |
9/16/2016 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (60)--PGE's Annual Power Cost Variance Deferral Report for January-August 2016. Confidential to locked cabinet #690(19). |
Date: |
8/23/2016 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (59)--PGE's Annual Power Cost Variance Deferral Report for January-July 2016.CONFIDENTIAL Attachments are located in locked cabinet, env. no. 690(18)). |
Date: |
7/26/2016 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (58)--PGE's Annual Power Cost Variance Deferral Report for January-June 2016. (CONFIDENTIAL Attachments are located in locked cabinet, env. no. 690(17)). |
Date: |
6/29/2016 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (57)--PGE's Annual Power Cost Variance Deferral Report for January - May 2016. (CONFIDENTIAL Attachments are located in locked cabinet, env. no. 690(16)). |
Date: |
5/26/2016 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (56)--PGE's Annual Power Cost Variance Deferral Report for January - April 2016. (CONFIDENTIAL Attachments are located in locked cabinet, env. no. 690(15)). |
Date: |
4/21/2016 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (55)--PGE's Annual Power Cost Variance Deferral Report for January - March 2016. (CONFIDENTIAL Attachments are located in locked cabinet, env. no. 690(14)). |
Date: |
3/18/2016 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (54)--PGE's Annual Power Cost Variance Deferral Report for January - February 2016. (CONFIDENTIAL Attachments are located in locked cabinet, env. no. 690(13)). |
Date: |
2/16/2016 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (53)--PGE's Annual Power Cost Variance Deferral Report for January 2016. (CONFIDENTIAL Attachments are located in locked cabinet, env. no. 690(12)). |
Date: |
1/20/2016 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (52)--PGE's Annual Power Cost Variance Deferral Report for January-December 2015. Filed by Stefan Brown. (CONFIDENTIAL Attachments are located in locked cabinet, env. no. 690(11)) |
Date: |
12/23/2015 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (51)--PGE's Annual Power Cost Variance Deferral Report for January-November 2015. Filed by Stefan Brown. (CONFIDENTIAL Attachments are located in locked cabinet, env. no. 690(10)) |
Date: |
11/16/2015 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (50)--PGE's Annual Power Cost Variance Deferral Report for January-October 2015. Filed by Patrick G. Hager. (CONFIDENTIAL Attachments are located in locked cabinet, env. no. 690(9).] |
Date: |
10/19/2015 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (49)--PGE's Annual Power Cost Variance Deferral Report for January-September 2015. (CONFIDENTIAL Attachments are located in locked cabinet, env. no. 690(8).] |
Date: |
9/18/2015 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (48)--PGE's Annual Power Cost Variance Deferral Report for January-August 2015. (CONFIDENTIAL Attachments are located in locked cabinet, env. no..690(7).] |
Date: |
8/19/2015 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (47)--PGE's Annual Power Cost Variance Deferral Report for January-July 2015. (CONFIDENTIAL Attachments are located in locked cabinet, env. no. 690 (6)). |
Date: |
7/20/2015 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (46)--PGE's Annual Power Cost Variance Deferral Report for January-June 2015. (CONFIDENTIAL Attachments are located in locked cabinet, env. no. 690 (5)). |
Date: |
6/24/2015 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (45)--PGE's Annual Power Cost Variance Deferral Report for January-May 2015. (CONFIDENTIAL Attachments are located in locked cabinet, env. no. 690 (4)). |
Date: |
5/12/2015 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (44)--PGE's Annual Power Cost Variance Deferral Report for January-April 2015. (CONFIDENTIAL Attachments are located in locked cabinet, env. no. 690 (2)). |
Date: |
4/13/2015 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (43)--PGE's Annual Power Cost Variance Deferral Report for January- March 2015. (CONFIDENTIAL Attachments are located in locked cabinet, env. no. 690 (1)). |
Date: |
3/12/2015 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (42)--PGE's Annual Power Cost Report for January - February 2015 dated 3-12-15 (Confidential report is located in locked cabinet, env. no. 690(3)). |
Date: |
2/18/2015 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (41)--PGE's Annual Power Cost Variance Deferral Report for January 2015. (CONFIDENTIAL Attachments are located in locked cabinet, env. no. 690). |
Date: |
1/16/2015 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (40)--PGE's Annual Power Cost Variance Deferral Report for January - December 2014. CONFIDENTIAL Attachments are located in locked cabinet, env. no. 339(87)). |
Date: |
12/23/2014 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (39)--PGE's Annual Power Cost Variance Deferral Report for January - November. CONFIDENTIAL Attachments are located in locked cabinet, env. no. 339(86)). |
Date: |
11/20/2014 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (38)--PGE's Annual Power Cost Variance Deferral Report for January - October. (CONFIDENTIAL Attachments are located in locked cabinet, env. no. 339(85)). |
Date: |
10/16/2014 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (37)--PGE's Annual Power Cost Variance Deferral Report for January - September. (CONFIDENTIAL Attachments are located in locked cabinet, env. no. 339(84)). |
Date: |
9/16/2014 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (36)--PGE's Annual Power Cost Variance Deferral Report for January - August. (CONFIDENTIAL Attachments are located in locked cabinet, env. no. 339(83)). |
Date: |
8/18/2014 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (35)--PGE's Annual Power Cost Variance Deferral Report for January - July (CONFIDENTIAL Attachments are located in locked cabinet, env. no. 339(82)). |
Date: |
7/17/2014 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (34)--PGE's Annual Power Cost Variance Deferral Report for January - June 2014 (CONFIDENTIAL report Attachments 1 and Attachment 2 CD is located in locked cabinet, env. no. 339(81)). |
Date: |
6/17/2014 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (33)--PGE's Annual Power Cost Variance Deferral Report for January - May 2014. (CONFIDENTIAL report Attachments 1 and Attachment 2 CD is located in locked cabinet, env. no. 339(80)). |
Date: |
5/16/2014 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (32)--PGE's Annual Power Cost Variance Deferral Report for January - April 2014. (CONFIDENTIAL report Attachments 1 and Attachment 2 CD is located in locked cabinet, env. no. 339(79)). |
Date: |
4/16/2014 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (31)--PGE's Annual Power Cost Variance Deferral Report for January - March 2014. (CONFIDENTIAL report Attachments 1 and Attachment 2 CD is located in locked cabinet, env. no. 339(78)). |
Date: |
3/28/2014 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (30)--PGE's Annual Power Cost Variance Deferral Report for January - February 2014. (CONFIDENTIAL report on CD is located in locked cabinet, env. no. 339(77)). |
Date: |
2/24/2014 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (28)--PGE's Revision to January through December 2013 Annual Power Cost Variance Deferral Report; filed electronically by Patrick G. Hager. (CONFIDENTIAL report on CD is located in locked cabinet, env. no. 339(75)). |
Date: |
2/18/2014 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (29)--PGE's Annual Power Cost Variance Deferral Report for January 2014. (CONFIDENTIAL report on CD is located in locked cabinet, env. no. 339(76)). |
Date: |
1/15/2014 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (28)--PGE's Annual Power Cost Variance Deferral Report, January through December 2013 filed electronically by Patrick G. Hager. Hard copy rec'd 1/23/14. (CONFIDENTIAL report on CD is located in locked cabinet, env. no. 339(75)). |
Date: |
12/17/2013 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (27)--PGE's Annual Power Cost Variance Deferral Report, January through November 2013 filed electronically by Patrick G. Hager. (CONFIDENTIAL attachments are located in locked cabinet, env. no. 339(74)). |
Date: |
11/19/2013 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (26)--PGE's Annual Power Cost Variance Deferral Report, January through October 2013 filed electronically by Patrick G. Hager. (CONFIDENTIAL attachments are located in locked cabinet, env. no. 339(73)). |
Date: |
10/15/2013 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (25)--PGE's Annual Power Cost Variance Deferral Report, January through September 2013 filed electronically by Patrick G. Hager. CONFIDENTIAL attachments are located in locked cabinet, env. no. 339(72)). |
Date: |
9/19/2013 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (24)--PGE's Annual Power Cost Variance Deferral Report, January through August 2013 filed electronically by Patrick G. Hager. CONFIDENTIAL attachment is located in locked cabinet, env. no. 339(71)). |
Date: |
8/19/2013 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (23)--PGE's Annual Power Cost Variance Deferral Report, January through July 2013 filed electronically by Patrick G. Hager. (CONFIDENTIAL attachments with CD are located in locked cabinet, env. no. 339(70).) |
Date: |
7/17/2013 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (22)--PGE's Annual Power Cost Variance Deferral Report, January through June 2013 filed electronically by Patrick G. Hager. (CONFIDENTIAL attachment is located in locked cabinet, env. no. 339(69)). |
Date: |
6/14/2013 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (21)--PGE's Annual Power Cost Variance Deferral Report, January through May 2013 filed electronically by Patrick G. Hager. (CONFIDENTIAL attachment is located in locked cabinet, env. no. 339(68)). |
Date: |
5/16/2013 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (20)--PGE's Annual Power Cost Variance Deferral Report, January through April 2013 filed electronically by Patrick G. Hager.R(CONFIDENTIAL attachment is located in locked cabinet, env. no. 339(67)). |
Date: |
4/22/2013 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (19)--PGE's Annual Power Cost Variance Deferral Report through March 2013 filed electronically by Patrick G. Hager. (CONFIDENTIAL attachment is located in locked cabinet, env. no. 339(66)). |
Date: |
3/22/2013 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (18)--PGE's Annual Power Cost Variance Deferral Report through February 2013 filed electronically by Patrick G. Hager. (CONFIDENTIAL report CD located in locked cabinet, env. no. 339(65) |
Date: |
2/19/2013 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (17)--PGE's Annual Power Cost Variance Deferral Report through January 2013 filed electronically by Patrick G. Hager. (CONFIDENTIAL Attachment is located in locked cabinet, env. no. 339(64). |
Date: |
1/25/2013 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (16)--PGE's Annual Power Cost Variance Deferral Report for the period January through December 2012 filed electronically by Patrick G. Hager. (CONFIDENTIAL Report with CD located in locked cabinet, env. no. 339(63). |
Date: |
12/12/2012 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (15)--PGE's Annual Power Cost Variance Deferral Report for the period January through November 2012 filed electronically by Patrick G. Hager. |
Date: |
11/28/2012 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (14)--PGE's Annual Power Cost Variance Deferral Report for the period January through October 2012 filed electronically by Patrick G. Hager. |
Date: |
10/18/2012 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (13)--PGE's Annual Power Cost Variance Deferral Report for the period January through September 2012 filed electronically by Patrick G. Hager. |
Date: |
9/21/2012 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (12)--PGE's Annual Power Cost Variance Deferral Report January through August 2012 filed by Patrick G. Hager. The report is designated as confidential and is not available online.
Key Words:
UM 1294 |
Date: |
8/23/2012 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (11)-- PGE's Annual Power Cost Variance Deferral Report (January--July 2012); filed electronically by Patrick G. Hager.
Key Words:
UM 1294 |
Date: |
7/16/2012 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (10) - PGE's Annual Power Cost Variance Deferral Report (January--June 2012); Hard copy of confidential filing located in env. no. 339 (58) in locked cabinet; rec'd 7/17/12. Filed electronically by Patrick G. Hager.
|
Date: |
6/20/2012 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (9) - PGE Annual Power Cost Variance Deferral Report (Jan-May 2012] at the request of staff; {Report is confidential and subject to Protective Order No. 07-088.) Filed electronically by Patrick G. Hager.
|
Date: |
5/23/2012 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (8) -- PGE's Annual Power Cost Variance Deferral Report Deferral Report (Jan-April 2012] at the request of staff; Confidential filing located in env. no. 339(57) in locked cabinet. Filed electronically by Patrick G. Hager.
Key Words:
PGE
Portland General Electric Company
Monthly Power Cost Report
UM 1294 |
Date: |
4/16/2012 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (7) -- PGE's Monthly Update of Annual Power Cost Variance Deferral Report (January through March 2012]; Filed electronically by Patrick G. Hager.
|
Date: |
3/19/2012 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (6)-- PGE's Monthly Update of Annual Power Cost Variance Deferral Report (Jan-Feb 2012] at the request of staff; Confidential portion of filing is located in env. # 339(56) in locked cabinet. Filed electronically by Patrick G. Hager.
|
Date: |
2/22/2012 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (5) -- PGE's Monthly Update of Annual Power Cost Variance Deferral Report [January 2012] at the request of staff; [Confidential CD is located in env. no. 339(55) in locked cabinet.] Filed electronically by Patrick G. Hager.
|
Date: |
1/17/2012 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (4) -- PGE's Monthly Update of Annual Power Cost Variance Deferral Report [January through December 2011] at the request of staff; filed electronically by Patrick G. Hager. Hard copy (CD and ledger) rec'd 1/18/12 are confidential and located in env no. 339(54) in locked cabinet. |
Date: |
12/22/2011 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (3)--PGE's Monthly Update of Annual Power Cost Variance Deferral Report [January through November 2011] at the request of Staff; filed electronically by Patrick G. Hager. Hard copy (CDs) rec'd 12/27/11 are confidential (Env No. 339 (53)). |
Date: |
11/17/2011 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (2)--PGE's Monthly Update of Annual Power Cost Variance Deferral Report [January through October 2011] at the request of staff; filed electronically by Alex Tooman for Patrick G. Hager. Hard copy (CDs) rec'd 11/21/11 are confidential (Env no. 339(52)). |
Date: |
10/13/2011 |
Action: SUPPLEMENTAL APPLICATION |
|
|
Description
RE 4 (1) -- PGE's Monthly Update of Annual Power Cost Variance Deferral Report January through September, 2011 at the request of staff; Filed by Patrick Hager. Report is confidential. No hard copy rec'd. |
Date: |
9/27/2011 |
Action: INITIAL (APPLICATION, COMPLAINT, PETITION) |
|
|
Description
In the Matter of
PORTLAND GENERAL ELECTRIC COMPANY
Monthly Update to Annual Power Cost Update Deferral Report at the request of staff; Docket UM 1294, confidential and subject to Protective Order 07-088. |
Date: |
9/27/2011 |
Action: ORDER COMPLIANCE |
|
|
Description
Portland General Electric Company (PGE) filed the monthly power cost report in compliance with a Staff request in UM 1294, subject to Protective Order No. 07-088.
Key Words:
PGE
Portland General Electric Company
Monthly Power Cost Report
UM 1294
|