eDockets
Docket Summary
***If sending a message to PUC staff, please note that as of March 29, 2021, all emails end with @puc.oregon.gov (instead of @state.or.us).
Docket No:
ADV 1809
Docket Name:
PGE ADVICE NO. 25-38 ANNUAL UPDATE TARIFF
Submit Public Comment
Subject Company:
PORTLAND GENERAL ELECTRIC
PGE Advice No. 25-38, Annual Update Tariff. The purpose of this filing is to revise Schedule 125 consistent with the final net variable power costs (NVPC) forecast of $1,053 million determined in Docket No. UE 452. In addition, PGE resets the numerous...
Filing Date:
11/17/2025
Advice No:
25-38
Effective:
1/1/2026
Expiration:
Status:
ACCEPTED
Case Manager:
ANNA KIM
Phone:
971-239-2887
Email:
anna.kim@puc.oregon.gov
Email Service List (semi-colon delimited)
Email Service List (comma delimited)
If you experience problems with the
above
'Email Service List' links,
please try one of these:
Service List Popup (semi-colon delimited)
Service List Popup (comma delimited)
General information about Tariff Filings.
ACTIONS
SERVICE LIST
SCHEDULE
Public Comments
Sort By Date
Sort By Type
Date:
12/19/2025
Action:
ACCEPTED UTILITY FILING
Description
See Docket No. UE 452 for staff memo and letter accepting this filing in compliance with Order No. 25-439.
Date:
12/19/2025
Action:
OTHER CORRESPONDENCE (ACKN, SVC, LTR)
Description
Staff Memo to file recommending acknowledgement letter be sent filed by David Abraham.
Date:
12/15/2025
Action:
REPLACEMENT SHEETS, ADDITIONAL MATERIAL
Description
PGE Errata Filing of Advice No. 25-38, Annual Update Tariff. The purpose of this errata filing corrects the pricing of the new Flood LED luminaire options. This filing also includes a Less Than Statutory Notice (LSN).
Date:
11/17/2025
Action:
INITIAL UTILITY FILING
Description
PGE Advice No. 25-38, Annual Update Tariff. The purpose of this filing is to revise Schedule 125 consistent with the final net variable power costs (NVPC) forecast of $1,053 million determined in Docket No. UE 452. In addition, PGE resets the numerous System Usage, Distribution, and lighting fixture charges contained in PGE's base rate schedules consistent with the Special Conditions contained in Schedule 129.
New Search