| File Date |
Daily Filings |
Status |
|
| 12/6/2024 |
PACIFIC POWER - QUALIFYING FACILITY CONTRACTS |
|
Docket No. RE 142
|
|
| |
In the Matter of PACIFICORP, dba PACIFIC POWER Information Filing of Qualifying Facility Contracts or Summaries per OAR 860-029-0020(1).
Key Words:
Qualifying Facility
QF
OAR 860-029-0020
PURPA
|
|
|
| |
| 12/5/2024 |
PUBLICLY-OWNED UTILITIES AVOIDED COSTS |
|
Docket No. RE 172
|
|
| |
Publicly-Owned Utilities Avoided Cost filings per OAR 860-029-0080(2)
|
|
|
| |
| 12/5/2024 |
NW NATURAL LATE PAYMENT RATE AND INTEREST UM 779 COMPLIANCE |
|
Docket No. ADV 1683
Advice No. 24-24
Effective Date 1/1/2025
|
ALLOWED |
| |
NW Natural's Advice No. 24-24. The purpose of this filing is to revise Schedule C to reflect the change in the Late Payment
Charge.
|
|
|
| |
| 12/5/2024 |
PORTLAND GENERAL ELECTRIC COMPANY |
|
Docket No. UM 1422
|
|
| |
In the Matter of
PORTLAND GENERAL ELECTRIC COMPANY
Application for Waiver of OAR 860-038-0640, Compliance Filing Requirements for 2009.
Filed by Barbara W. Halle.
|
|
|
| |
| 12/5/2024 |
PGE - QUALIFYING FACILITY CONTRACTS |
|
Docket No. RE 143
|
|
| |
In the Matter of PORTLAND GENERAL ELECTRIC COMPANY Information Filing of Qualifying Facility Contracts or Summaries per OAR 860-029-0020(1).
Key Words:
Qualifying Facility
QF
OAR 860-029-0020
PURPA
|
|
|
| |
| 12/5/2024 |
PGE ADVICE NO. 24-37 SCHEDULE 109 EE FUNDING ADJUSTMENT |
|
Docket No. ADV 1684
Advice No. 24-37
Effective Date 1/1/2025
|
ALLOWED |
| |
PGE Advice No. 24-37, Schedule 109 Energy Efficiency Funding Adjustment The purpose of this filing is to request an increase in the amount of cost-effective energy efficiency funding for Energy Trust of Oregon (ETO) through PGE's Schedule 109. At the Special Public Meeting on November 5, 2024, regarding the ETO's 2025-30 Budget and Action Plan, the Commission adopted ETO's 2025 Budget and Staff's recommendation directing Utilities to plan for tariff changes to occur January 1, 2025. This filing includes a Less Than Statutory Notice (LSN)
|
|
|
| |
| 12/4/2024 |
NON INVESTOR-OWNED UTILITY WILDFIRE MITIGATION PLANS |
|
Docket No. RO 14
|
|
| |
Non Investor-Owned Utility Wildfire Mitigation Plans
ORS 757.966
|
|
|
| |
| 12/4/2024 |
PGE LATE PAYMENT RATE AND INTEREST UM 779 COMPLIANCE |
|
Docket No. ADV 1680
Advice No. 24-36
Effective Date 1/1/2025
|
ALLOWED |
| |
PGE Advice No. 24-36 UM 779 Compliance Filing, Late Payment Rate and Interest Accrued on Customer Deposits. filing reflects an increase to the late-payment charge from the current 2.3 percent to 2.4 percent monthly and a decrease in the annualized interest rate applied to non-residential customer deposits from the current 5.5 percent to 4.5 percent.
|
|
|
| |
| 12/4/2024 |
ROUND LAKE SOLAR NOTICE OF INTENT TO FILE COMPLAINT OF ENFORCEMENT |
|
|
Docket No. UM 2359
|
|
| |
Complaint forthcoming. (12/24/24 Notice of Intent to File Complaint of Enforcement.)
|
|
|
| |
| 12/4/2024 |
PACIFICORP LATE PAYMENT RATE AND INTEREST UM 779 COMPLIANCE |
|
Docket No. ADV 1681
Advice No. 24-021
Effective Date 1/1/2025
|
ALLOWED |
| |
PacifiCorp's Advice No. 24-021. The purpose of this filing is to confirm that the rates for late payments and customer deposit interest.
|
|
|
| |
| 12/4/2024 |
ROATS WATER LATE PAYMENT RATE AND INTEREST UM 779 COMPLIANCE |
|
Docket No. ADV 1682
Advice No. 21-2
Effective Date 1/1/2025
|
ALLOWED |
| |
Roats Water's Advice No. 21-2. This compliance filing revises the interest rate applied to deposits from 5.5 percent to 4.5 percent and the late payment rate from 2.3 percent to 2.4 percent.
|
|
|
| |
| 12/3/2024 |
COPIES OF FCC FILINGS |
|
Docket No. RT 2
|
|
| |
This report docket is opened for informational Copies of FCC Filings.
|
|
|
| |
| 12/3/2024 |
PACIFICORP'S ADVICE NO. 24-020 SYSTEM BENEFIT CHARGE SCHEDULE 291 |
|
Docket No. ADV 1678
Advice No. 24-020
Effective Date 1/1/2025
|
ALLOWED |
| |
PacifiCorp's Advice No. 24-020 , System Benefits Charge. The purpose of this filing is to update the amounts collected through Schedule 291 for funding for ETO. This filing includes a Less Than Statutory Notice (LSN)
|
|
|
| |
| 12/3/2024 |
PUBLICLY-OWNED UTILITIES AVOIDED COSTS |
|
Docket No. RE 172
|
|
| |
Publicly-Owned Utilities Avoided Cost filings per OAR 860-029-0080(2)
|
|
|
| |
| 12/3/2024 |
CASCADE LATE PAYMENT RATE AND INTEREST UM 779 COMPLIANCE |
|
Docket No. ADV 1679
Advice No. O24-12-01
Effective Date 1/1/2025
|
ALLOWED |
| |
Cascade Advice No. O24-12-01. This compliance filing revises the interest rate applied to deposits from 5.5 percent to 4.5 percent and the late payment rate from 2.3 percent to 2.4 percent. These changes align with the guidance adopted in Commission Order No. 24-429.
|
|
|
| |
| 12/3/2024 |
INVESTOR-OWNED UTILITIES PUBLIC SAFETY POWER SHUT OFF (PSPS) REPORTS |
|
Docket No. UM 2268
|
|
| |
DOCKET FOR PUBLIC SAFETY POWER SHUT OFF REPORTS FOR INVESTOR-OWNED UTILITIES.
SEE OAR 860-300-0070
PLEASE SERVE ALL REPORTS TO INDUSTRY LIST
|
|
|
| |
| 12/3/2024 |
TEMPORARY RULES RELATED TO PROTECTIONS AGAINST DISCONNECTION |
|
|
Docket No. AR 667
|
|
| |
In the Matter of Rulemaking to Adopt Temporary Rules Related to Protections Against Disconnections.
|
|
|
| |
| 12/2/2024 |
NORTHWEST NATURAL ENERGY EFFICIENCY AVOIDED COST REPORT |
|
Docket No. RG 87
|
|
| |
In the Matter of NORTHWEST NATURAL GAS COMPANY, DBA NW NATURAL, 2019 Energy Efficiency Avoided Cost Report.
Key Words:
OAR 860-030-0011
UM 1893
Avoided Cost
Energy Efficiency
|
|
|
| |
| 12/2/2024 |
NW NATURAL ADVICE NO. 24-24 SCHEDULE H - LARGE VOLUME NON-RESIDENTIAL HPGS RIDER |
|
Docket No. ADV 1676
Advice No. 24-24
Effective Date 2/1/2025
|
ALLOWED |
| |
NW Natural's Advice No. 24-23, Schedule H - Large Volume Non-Residential High Pressure Gas Service (HPGS)
Rider.
|
|
|
| |
| 12/2/2024 |
AVISTA ADVICE NO. 24-11-G TARIFF REVISIONS |
|
Docket No. ADV 1677
Advice No. 24-11-G
Effective Date 1/1/2025
|
ALLOWED |
| |
Avista's Advice No. 24-11-G Tariff Revisions Made in Accordance with Annual Updates in Docket UM 779.
This filing contains an LSN request.
|
|
|
| |