eDockets
Docket Summary
***If sending a message to PUC staff, please note that as of March 29, 2021, all emails end with @puc.oregon.gov (instead of @state.or.us).

Docket No:  ADV 1784 Docket Name:  ZIPLY FIBER ADVICE NO. 2025-3 EXCHANGE AND NETWORK SERVICES Submit Public Comment
Subject Company:  ZIPLY FIBER OF OREGON LLC    
Ziply Fiber of Oregon, LLC dba Ziply Fiber Advice No. 2025-3. The purpose of this filing is to (1) change the name of the Facility Fee to Road Recovery Fee, which reflects costs associated with maintaining and accessing public rights-of-way to more...
Filing Date:  9/10/2025 Advice No: 2025-3      
Effective:  10/6/2025 Expiration:   Status:  ACKNOWLEDGED
Case Manager:  JOSEPH BARTHOLOMEW Phone:  (503) 689-4016
Email:   joseph.bartholomew@puc.oregon.gov
Email Service List (semi-colon delimited)      Email Service List (comma delimited)
  If you experience problems with the above 'Email Service List' links,
please try one of these:
Service List Popup (semi-colon delimited)     Service List Popup (comma delimited)
General information about Tariff Filings.

ACTIONSSERVICE LISTSCHEDULE Public Comments
Sort By Date        Sort By Type
Date: 10/6/2025 Action:  OTHER CORRESPONDENCE (ACKN, SVC, LTR)  Searchable Doc  
  Description
Proof of service of letter 10/6/2025. 
Date: 10/6/2025 Action:  ACKNOWLEDGED UTILITY FILING  Searchable Doc  
  Description
Letter sent.  
Date: 10/6/2025 Action:  OTHER CORRESPONDENCE (ACKN, SVC, LTR)  Searchable Doc  
  Description
Staff Memo to file recommending acknowledgement letter be sent filed by Joseph Bartholomew. 
Date: 9/23/2025 Action:  REPLACEMENT SHEETS, ADDITIONAL MATERIAL  Searchable Doc  
  Description
Ziply Fiber of Oregon, LLC dba Ziply Fiber Updated Advice No. 2025-3. The updated sheet alters the revised name change from Road Recovery Fee to Road Work Recovery Fee and reduces the original proposed increase to $5.00 to $4.50 to remain within the guidelines of Ziply Fiber's Price Plan.  
Date: 9/10/2025 Action:  INITIAL UTILITY FILING  Searchable Doc  
  Description
Ziply Fiber of Oregon, LLC dba Ziply Fiber Advice No. 2025-3. The purpose of this filing is to (1) change the name of the Facility Fee to Road Recovery Fee, which reflects costs associated with maintaining and accessing public rights-of-way to more clearly reflect the nature of the fee and to align the naming convention with Ziply Fiber’s other service areas, and (2) increase the monthly rate from $1.50 to $5.00. 

 

New Search