In the Matter of Requests for Waiver of Rule Provisions. This docket will be used for requests for waiver of rule except those related to the solar pilot program (UM 1538), RSPF Surcharge (UM 1517) and IRP related (in the respective LC docket).
In the Matter of AVIST CORPORATION, Annual Report of Bills Adjusted.
(See previous action entry for electronic version.)
Key Words
Bills Adjusted
OAR 860-021-0135
Order No. 14-230
In the Matter of Requests for Waiver of Rule Provisions. This docket will be used for requests for waiver of rule except those related to the solar pilot program (UM 1538), RSPF Surcharge (UM 1517) and IRP related (in the respective LC docket).
In the Matter of Requests for Waiver of Rule Provisions. This docket will be used for requests for waiver of rule except those related to the solar pilot program (UM 1538), RSPF Surcharge (UM 1517) and IRP related (in the respective LC docket).
In the Matter of
Self-Certifications as FERC Qualifying Facility (QF) in compliance with Federal Statute Title 18 C.F.R. 292.207 (FERC Form 556) and/or as an Exempt Wholesale Generator (EWG).
In the Matter of
PORTLAND GENERAL ELECTRIC COMPANY
Application for Deferral of Expenses Associated with a Photovoltaic Volumetric Incentive Rate Pilot.
Filed by Patrick G. Hager.
In the Matter of PORTLAND GENERAL ELECTRIC COMPANY, 2015 Annual Power Cost Variance Mechanism; Filed by Stefan Brown. (CONFIDENTIAL Exhibit 103 is located in locked cabinet, env. no. 788).