eDockets
Docket Summary
Return to Search Page eFiling

Docket No:  UM 1401 Docket Name:  STAFF INVESTIGATION INTO INTERCONNECTION OF PURPA QF LARGER THAN 10 MEGAWATTS Submit Public Comment
   
         See also:  RE 62   
In the Matter of THE PUBLIC UTILITY COMMISSION OF OREGON Staff's investigation into interconnection of PURPA Qualifying Facilities with a nameplate capacity larger than 10 megawatts to a public utility's transmission or distribution system. (Staff...
Filing Date:  11/4/2008    Public Mtg: 1/14/2020   
Order:  10-132Order Signed:  4/7/2010 
Email Service List (semi-colon delimited)      Email Service List (comma delimited)
  If you experience problems with the above 'Email Service List' links,
please try one of these:
Service List Popup (semi-colon delimited)     Service List Popup (comma delimited)

ACTIONSSERVICE LISTSCHEDULE Public Comments
Sort By Date        Sort By Type
Date: 11/21/2023 Action:  COMPLIANCE  Searchable Doc  
  Description
PacifiCorp's Compliance per Order No. 10-132, Qualifying Facility Large Generator Interconnection Agreement. Filed by Matthew McVee.  
Date: 3/8/2023 Action:  SERVICE LIST CHANGE  Searchable Doc  
  Description
PGE's Request to Change the Service List, removing Cece Coleman, adding Donald Light. Filed by Donald Light.  
Date: 12/1/2022 Action:  COMPLIANCE  Searchable Doc  
  Description
PacifiCorp's Errata Qualifying Facility Large Generator Interconnection Agreement, filed by Matthew McVee.  
Date: 11/30/2022 Action:  COMPLIANCE  Searchable Doc  
  Description
PGE's Compliance per Order No. 10-132, QF Large Generator Interconnection Agreement (QF-LGIA). Filed by Robert Macfarlane.  
Date: 6/18/2021 Action:  SERVICE LIST CHANGE  Searchable Doc  
  Description
UM 1401 - PGE's Change of Service List removing douglas Tingey CeCe Coleman Filed by Cece Coleman 
Date: 6/7/2021 Action:  COMPLIANCE  Searchable Doc  
  Description
PGE's Compliance per Order No. 10-132, QF Large Generator Interconnection Agreement (QF-LGIA). Filed by Robert Macfarlane.  
Date: 5/19/2021 Action:  COMPLIANCE  Searchable Doc  
  Description
AMENDED PacifiCorp's Compliance per Order No. 10-132, Qualifying Facility Large Generator Interconnection Agreement filed 8/19/20 changing designation to "non confidential." Filed by Shelley McCoy. 
Date: 2/18/2021 Action:  COMPLIANCE  Searchable Doc  
  Description
PacifiCorp's Compliance per Order No. 10-132, Qualifying Facility Large Generator Interconnection Agreement. Filed by Etta Lockey.  
Date: 8/19/2020 Action:  COMPLIANCE  Searchable Doc  
  Description
PacifiCorp's Compliance per Order No. 10-132, Qualifying Facility Large Generator Interconnection Agreement. Filed by Etta Lockey. Confidential to locked cabinet, env. no. 1131 - "Confidentia"l designation removed pursuant to reifled Compliance on 5/19/21. 
Date: 4/24/2020 Action:  COMPLIANCE  Searchable Doc  
  Description
PacifiCorp's Compliance per Order No. .10-132, Qualifying Facility Large Generator Interconnection Agreement. Filed by Mike Wilding.  
Date: 1/21/2020 Action:  ORDER  Getdocs  
  Order No:   20-021 
  Description
Order No. 20-021, signed by Nolan Moser, Chief Administrative Law Judge; DISPOSITION: STAFF'S RECOMMENDATION ADOPTED. Copies served on 1/21/20.  
Date: 1/8/2020 Action:  STAFF REPORT  Searchable Doc  
  Description
Staff Report for the January 14, 2020 Public Meeting (Item No. CA6), by Natascha Smith.  
Date: 12/6/2019 Action:  COMPLIANCE  Searchable Doc  
  Description
PacifiCorp's Complaince per Order No. 10-132, Qualifying Large Generator Interconnection Agreement. Filed by Etta Lockey.  
Date: 11/2/2017 Action:  OTHER CORRESPONDENCE (ACKN, SVC, LTR)  Searchable Doc  
  Description
Last Used service list 
Date: 5/15/2014 Action:  COMPLIANCE   
  Description
IDAHO POWER's COMPANY Oregon Generator Interconnection Activities Report for 2013. (See RE 62 (2) for electronic version). 
Date: 7/18/2013 Action:  SERVICE LIST CHANGE  Searchable Doc  
  Description
ODOE’s Notice of Change to Service List, removing Vijay Satyal and adding Kacia Brockman and Matt Krumenauer; Filed electronically by Jeffery R. Seeley. 
Date: 5/7/2013 Action:  COMPLIANCE   
  Description
IDAHO POWER's COMPANY Oregon Generator Interconnection Activities Report for 2012. (See RE 62 (1) for electronic version). 
Date: 3/25/2013 Action:  NOTICE  Searchable Doc  
  Description
ODOE's Notice of Substitution of Counsel replacing Janet Prewitt with Renee France; Filed electronically by Renee M. France. Hard copy rec'd 3/25/13.  
Date: 5/14/2012 Action:  COMPLIANCE   
  Description
Idaho Power's Oregon Generator Interconnection Activities Report for 2011 in compliance with OAR 860-082-0065(3) and Order No. 10-132 of Docket UM 1401; Electronically filed by Lisa Nordstrom. [SEE RE62 for electronic version.] 
Date: 1/30/2012 Action:  SERVICE LIST CHANGE  Searchable Doc  
  Description
ODOE's Notice of Change to Service List, removing Andrea F. Simmons; Filed electronically by Jeffery R. Seeley. Hard copy rec'd 1/31/12. 
Date: 8/24/2010 Action:  SERVICE LIST CHANGE  Searchable Doc  
  Description
ODOE's Request for Change to Service List, removing Robin Straughan and adding Vijay A. Satyal; Filed electronically by Melissa D. Eastlund. Hard copy rec'd 8/26/10. 
Date: 4/7/2010 Action:  ORDER  Getdocs  
  Order No:   10-132 
  Description
Order No. 10-132 signed by Commissioners Ray Baum, John Savage, and Susan K. Ackerman; DISPOSITION: STANDARD INTERCONNECTION PROCEDURES AND AGREEMENTS ADOPTED FOR LARGE QUALIFYING FACILITIES. Copies served electronically and via U. S. Mail 4/8/10. 
Date: 3/22/2010 Action:  OTHER FILING/PLEADING  Searchable Doc  
  Description
OREGON DEPARTMENT OF ENERGY's Notice of Change to Service List with contact of Andrea Simmons. Electronically filed by Melissa D. Eastland. Hard copy rec'd. 3/22/10.  
Date: 2/12/2010 Action:  OTHER FILING/PLEADING  Searchable Doc  
  Description
SERVICE LIST CHANGE--PacifiCorp's request for change in service list, updating contact information for Jordan A. White; Filed electronically by Jordan A. White; Hard copy rec'd 2/17/10. 
Date: 1/21/2010 Action:  OTHER FILING/PLEADING  Searchable Doc  
  Description
STAFF's letter stating it will not be filing a reply to Joint Utilities' Response to Bench Request; Filed by Michael T. Weirich. Electronic version and hard copy rec'd 1/22/10. 
Date: 12/29/2009 Action:  COMMENTS/RESPONSE  Searchable Doc  
  Description
Joint Utilities' Response to Chief ALJ's Bench Request (PGE, Pacific Power, Idaho Power); Electronically filed; Hard copy rec'd 12/30/09. 
Date: 12/18/2009 Action:  MOTION  Searchable Doc  
  Description
Joint Utilities' Request for Extension of Time (Pacific Power, PGE, & Idaho Power); Electronically filed; Hard copy rec'd 12/21/09. (See also ALJ ruling 12/18/09.) 
Date: 12/18/2009 Action:  LAW JUDGE RULING/MEMORANDA  Searchable Doc  
  Description
Chief Administrative Law Judge Michael Grant issues Ruling; SCHEDULE AMENDED. Copies served electronically 12/18/09 and via U.S. Mail 12/21/09. 
Date: 11/30/2009 Action:  LAW JUDGE RULING/MEMORANDA  Searchable Doc  
  Description
Chief Administrative Law Judge Michael Grant issues a Bench Request requiring clarification of the parties' proposed changes. Copies served electronically 11/30/09 and via U.S. Mail 12/1/09. 
Date: 8/20/2009 Action:  OTHER FILING/PLEADING  Searchable Doc  
  Description
PGE's filing of standardized Qualified Facility-Large Generator Interconnection Procedures and standardized Qualified Facility-Large Generator Interconnection Agreement. Electronically filed by Cece L. Coleman. Hard copy rec'd 8-21-09. 
Date: 8/13/2009 Action:  COMMENTS/RESPONSE  Searchable Doc  
  Description
ICNU'S Reply Comments. Electronically filed by Irion Sanger. Hard copy rec'd 8/14/09. 
Date: 8/13/2009 Action:  COMMENTS/RESPONSE  Searchable Doc  
  Description
PGE, PACIFICORP, and IDAHO POWER's Joint Reply Comments. Electronically filed by Cece L. Coleman. Hard copy rec'd 8/14/09. 
Date: 8/13/2009 Action:  COMMENTS/RESPONSE  Searchable Doc  
  Description
ODOE's Reply Comments. Electronically filed by Janet L. Prewitt. Hard copy rec'd 8/14/09. 
Date: 8/13/2009 Action:  COMMENTS/RESPONSE  Searchable Doc  
  Description
Staff Reply Comments. Electronically filed by Michael Weirich. Hard copy rec'd 8/13/09.  
Date: 7/16/2009 Action:  LAW JUDGE RULING/MEMORANDA  Searchable Doc  
  Description
ALJ Sarah K. Wallace issues Ruling; DISPOSITION: SCHEDULE AMENDED. Copies served electronically 7/16/09 and via U.S. Mail 7/17/09.  
Date: 7/16/2009 Action:  MOTION  Searchable Doc  
  Description
STAFF's "Stipulated" Motion for Amendment to Schedule (expedited consideration requested); Filed by Michael T. Weirich. Hard copy and electronic version rec'd 7/16/09. 
Date: 6/23/2009 Action:  HEARING  Searchable Doc  
  Description
STAFF's Notice of Workshop; scheduled 7/6/09; 9:30 a.m. to noon; in the PUC Main Hearing Room; Filed electronically by Ed Durrenberger; Hard copy rec'd 6/23/09. 
Date: 6/8/2009 Action:  COMMENTS/RESPONSE  Searchable Doc  
  Description
ICNU's Opening Comments; together with Attachment A; Filed electronically by S. Bradley VanCleve; Hard copy rec'd 6/9/09. 
Date: 6/8/2009 Action:  COMMENTS/RESPONSE  Searchable Doc  
  Description
STAFF's Opening Comments; Filed by Ed Durrenberger; Electronic version and hard copy rec'd 6/8/09. 
Date: 5/12/2009 Action:  LAW JUDGE CONFERENCE REPORT  Searchable Doc  
  Description
ALJ Sarah K. Wallace Issues Prehearing Conference Memorandum: DISPOSITION: SCHEDULE FOR COMMENTS ADOPTED. Copies served electronically and via U.S. Mail 5/12/09. 
Date: 4/10/2009 Action:  CANCELLATION/CHANGE  Searchable Doc  
  Description
AMENDED NOTICE OF RESCHEDULING OF CONFERENCE (from 4/14/09 to 5/6/09); Copies served electronically 4/10/09 and mailed 4/13/09. CONFERENCE scheduled 5/6/2009 3:00 p.m. City: SALEM Room: MAIN HEARING RM, 1ST FL Building: PUC Address: 550 CAPITOL ST NE with dial in 503-365-4439, conf code 6782 Reporter: NONE Law Judge: WALLACE, SARAH K  
Date: 4/10/2009 Action:  MOTION  Searchable Doc  
  Description
STAFF's letter advising of the Parties' progress and Request on behalf of the Parties to reschedule the 4/14/09 conference for the week of May 4th; Filed electronically by Michael T. Weirich; Hard copy rec'd 4/10/09. 
Date: 4/2/2009 Action:  CONFERENCE  Searchable Doc  
  Description
NOTICE OF PREHEARING CONFERENCE (scheduled 4/14/09); Copies served electronically 4/2/09 and via U.S. Mail 4/3/09. (RESCHEDULED FOR 5/6/09--See 4/10/09 entry.) CONFERENCE scheduled 4/14/2009 1:30 PM with dial in available 503-365-4439, conf code 6782 City: SALEM Room: MAIN HEARING RM Building: PUC Address: 550 CAPITOL ST NE Reporter: NONE Law Judge: WALLACE, SARAH K  
Date: 4/1/2009 Action:  CONFERENCE  Searchable Doc  
  Description
STAFF's NOTICE OF WORKSHOP scheduled for April 7, 2009; 9:30 a.m. to noon in the Commission conf. rm.; Filed by Ed Durrenberger on 4/1/09; Copies served by Staff on 3/27/09 to parties only. 
Date: 3/20/2009 Action:  LAW JUDGE CONFERENCE REPORT  Searchable Doc  
  Description
ALJ Sarah K. Wallace issues Ruling; DISPOSITION: SCHEDULE SUSPENDED. Copies served electronically and via U.S. Mail 3/20/09. 
Date: 3/13/2009 Action:  CONFERENCE  Searchable Doc  
  Description
NOTICE OF TELEPHONE CONFERENCE scheduled 3/19/2009 9:00 AM TELEPHONE CONFERENCE, dial in 503-378-3333. Room: VIA TELEPHONE-MTN. CONF RM Reporter: NONE Law Judge: WALLACE, SARAH K Notice of Telephone Conference; dial in 503-378-3333, served electronically and via U.S. Mail on 3/13/09. 
Date: 3/12/2009 Action:  MOTION  Searchable Doc  
  Description
PACIFIC POWER's Request for Status Conference regarding Discovery and Request for Extension of Time to Respond to ICNU's Data Request; Filed electronically by Jeffrey S. Lovinger; Hard copy rec'd 3/16/09. 
Date: 3/9/2009 Action:  OTHER FILING/PLEADING  Searchable Doc  
  Description
IDAHO POWER COMPANY's Opening Comments and Submission of Draft Interconnection Procedures and Agreement; Filed electronically by Lisa Rackner; Hard copy rec'd 3/10/09. 
Date: 3/9/2009 Action:  OTHER FILING/PLEADING  Searchable Doc  
  Description
PORTLAND GENERAL ELECTRIC COMPANY's Draft Interconnection Procedures and Agreements for Qualifying Facilities; Filed electronically by Cece L. Coleman; Hard copy rec'd 3/10/09. 
Date: 3/5/2009 Action:  OTHER FILING/PLEADING  Searchable Doc  
  Description
PACIFIC POWER's Comments and Draft Interconnection Procedures and Agreements; electronically filed by Andrea L. Kelly for Jordan White. Hard copy rec'd 3/6/09. 
Date: 3/5/2009 Action:  LAW JUDGE RULING/MEMORANDA  Searchable Doc  
  Description
ALJ Sarah K. Wallace issues Ruling; DISPOSITION: TIME FOR SUBMITTING DRAFT INTERCONNECTION PROCEDURES AND AGREEMENTS EXTENDED. Copies served electronically 3/5/09 and via U.S. Mail 3/6/09. 
Date: 3/5/2009 Action:  MOTION  Searchable Doc  
  Description
PGE's Request for Extension of Time; electronically filed by Cece L. Coleman; Hard copy rec'd 3/9/09. 
Date: 3/5/2009 Action:  MOTION  Searchable Doc  
  Description
IDAHO POWER's Request for Extension of Time; electronically filed by Lisa Rackner. Hard copy rec'd 3/6/09.  
Date: 3/2/2009 Action:  OTHER FILING/PLEADING  Searchable Doc  
  Description
PGE's Request for Change to Service List; electronically filed by Cece L. Coleman. Hard copy rec'd 3/3/09. 
Date: 2/12/2009 Action:  LAW JUDGE RULING/MEMORANDA  Searchable Doc  
  Description
ALJ Sarah K. Wallace Issues Ruling: DISPOSITION: SCHEDULE PARTIALLY SUSPENDED. Copies served electronically and via U.S. Mail 2/12/09.  
Date: 1/30/2009 Action:  OTHER FILING/PLEADING  Searchable Doc  
  Description
STAFF's letter regarding parties' agreement made at workshop to hold in abeyance proceedings relating to AR 521 matters; Filed electronically by Michael T. Weirich; Hard copy rec'd 2/2/09. 
Date: 12/31/2008 Action:  LAW JUDGE RULING/MEMORANDA  Searchable Doc  
  Description
ALJ Sarah K. Wallace Issues Ruling: DISPOSITION: PETITION TO INTERVENE GRANTED. Copies served electronically and via U.S. Mail 12/31/08. Notice of Contested Case Rights, pursuant to ORS 183.413 attached to hard copy mailed to docket service list 12/31/08. 
Date: 12/11/2008 Action:  NOTICE  Searchable Doc  
  Description
STAFF's Notice of Workshop to be held January 26, 2009, 1:30 pm to 4:00 p.m.; Main Hearing Room at PUC. Utilities to present planned modifications; Filed by Kay Barnes for Lisa Schwartz electronically and hard copy rec'd 12/11/08. Dial in to be provided by Staff at a later date. 
Date: 12/10/2008 Action:  PETITION TO INTERVENE  Searchable Doc  
  Description
OREGON DEPARTMENT OF ENERGY's Motion to Intervene Out of Time with Petition to Intervene, listing contacts of Janet L. Prewitt and Robin Straughan, and requesting waiver of paper service. Filed electronically by Janet L. Prewitt. Petition to Intervene refiled electronically (to correct docket number). Hard copy rec'd 12/11/08. 
Date: 12/3/2008 Action:  LAW JUDGE CONFERENCE REPORT  Searchable Doc  
  Description
ALJ Sarah Wallace Issues Prehearing Conference Report: DISPOSITION; PETITIONS TO INTERVENE GRANTED; SCHEDULE ESTABLISHED. Copies served electronically 12/3/08 and via U.S. Mail 12/4/08. Notice of Contested Case Rights, pursuant to ORS 183.413, attached to hard copy mailed to docket service list on 12/4/08.  
Date: 12/2/2008 Action:  PETITION TO INTERVENE  Searchable Doc  
  Description
INDUSTRIAL CUSTOMERS OF NORTHWEST UTILITIES' Petition to Intervene, with contacts of S. Bradley Van Cleve and Tom Beach; Filed by Brendan E. Levenick for S. Bradley Van Cleve. Hard copy rec'd 12/3/08. 
Date: 11/25/2008 Action:  NOTICE  Searchable Doc  
  Description
CITIZENS' UTILITY BOARD OF OREGON's Notice of Intervention and Waiver of Paper Service, with contacts of G. Catriona McCracken and Bob Jenks. Filed electronically by G. Catriona McCracken; Hard copy rec'd 11/28/08. 
Date: 11/21/2008 Action:  OTHER FILING/PLEADING  Searchable Doc  
  Description
IDAHO POWER COMPANY's Request for Change to Service List, adding Dave Angell and Amie Jamieson; Filed electronically by Wendy McIndoo for Lisa F. Rackner and Amie Jamieson; Hard copy rec'd 11/24/08; Corrected Certificate of Service electronically filed 12/1/08 and in hard copy 12/2/08. 
Date: 11/20/2008 Action:  PETITION TO INTERVENE  Searchable Doc  
  Description
PORTLAND GENERAL ELECTRIC COMPANY's Petition to Intervene, with contacts of J. Richard George and Randall J. Dahlgren; Filed electronically by J. Richard George; Hard copy rec'd 11/24/08. 
Date: 11/20/2008 Action:  PETITION TO INTERVENE  Searchable Doc  
  Description
Idaho Power Company's Petition to Intervene (and Waiver of Paper Service). Electronically filed by Lisa F. Rackner. Hard copy rec'd. 11/21/08; Corrected Certificate of Service electronically filed 12/1/08 and in hard copy 12/2/08. 
Date: 11/19/2008 Action:  PETITION TO INTERVENE  Searchable Doc  
  Description
PacifiCorp, dba Pacific Power's Petition to Intervene and Waiver of Paper Service. Electronically filed by Andrea L. Kelly for Jordan A. White. Hard copy rec'd. 11/20/08. 
Date: 11/19/2008 Action:  CONFERENCE  Searchable Doc  
  Description
NOTICE OF PREHEARING CONFERENCE, dial in 503-378-3003; Copies served electronically and via U.S. Mail to UM 1401, UM 1129, AR 521 & AR 526 docket service lists on 11/19/08; and to Electric List via U.S. Mail only 11/19/08. CONFERENCE scheduled 12/2/2008 1:30 PM City: SALEM Room: MAIN HEARING RM Building: PUC Address: 550 CAPITOL ST NE Reporter: NONE Law Judge: WALLACE, SARAH K  
Date: 11/4/2008 Action:  INITIAL (APPLICATION, COMPLAINT, PETITION)  Searchable Doc  
  Description
In the Matter of THE PUBLIC UTILITY COMMISSION OF OREGON Staff's investigation into interconnection of PURPA Qualifying Facilities with a nameplate capacity larger than 10 megawatts to a public utility's transmission or distribution system. (Staff report for November 4, 2008 Public Meeting, Item No. 5; filed by Lisa Schwartz.)